- 37
-
ENGLISH
g
f
d
c
b
a
e
b
d
e
fi g. a
fi g. b
b
d
c 8
e
c
8
d
f
g
e
fi g. c
g
g
HOT-AIR DUCTWORK
KIT 12 (code 778150) (optional)
TO CHANNEL HOT AIR INTO AN ADJACENT ROOM
IN ADDITION TO THAT OF INSTALLATION
Includes:
a
Box
n° 1
b
Ø 8 pipe
n° 1
c
Smoke outlet end-piece
n° 1
g
Pipe blocking clamp
n° 2
NOTE:
THE FIRST PART OF THE FLEXIBLE PIPE MUST BE
COMPLETELY “RELAXED” IN SUCH AWAY TO ELI-
MINATE CORRUGATION. IN THIS WAY, THE INTER-
NAL DIAMETER WILL BE SLIGHTLY ENLARGED TO
FAVOUR ENTRANCE.
Procedure:
- Defi ne the position of the stove with respect to the walling
(fi g. a).
- Place the stove in its defi nite position.
- Extend the aluminium pipe (b) for hot air channelling, wi-
thout connecting the stove outlet.
- Fit the alluminium pipe to the hot air oulet on the back of the
stove (fi g.C) and fasten it by its blocking clamp (g)
- Install the terminal outlet (c) to the end of the alluminum pipe
by its blocking clamp (g) (fi g. c) in the room to heat