
– 19 –
3
Switch Chassis
The switch is designed to be installed in a standard 19-inch equipment rack.
Before continuing with switch installation, first review the general guidelines and
switch cooling requirements in this chapter.
This chapter includes these sections:
◆
“General Installation Guidelines” on page 19
◆
“How to Install the Switch in a Rack” on page 20
◆
“How to Install the Switch on a Shelf or Desktop.” on page 22
◆
“Switch Cooling Requirements” on page 23
General Installation Guidelines
Be sure to follow the guidelines below when choosing a location.
◆
The installation location should:
◆
be able to maintain its temperature within 0 to 50 °C (32 to 116 °F) and its
humidity within 10% to 90%, non-condensing.
◆
provide adequate space (approximately five centimeters or two inches) on all
sides for proper airflow.
◆
be accessible for installing, cabling and maintaining the device.
◆
allow the status LEDs to be clearly visible.
◆
Make sure twisted-pair cable is always routed away from power lines,
fluorescent lighting fixtures and other sources of electrical interference, such as
radios and transmitters.
◆
Make sure that the unit is connected to a separate grounded power outlet and
is powered from an independent circuit breaker. As with any equipment, using
a filter or surge suppressor is recommended. Verify that the external AC power
requirements for the switch can be met as listed under
Содержание ECS3510-26P
Страница 1: ...Installation Guide www edge core com ECS3510 26P 26 Port Layer 2 Gigabit Ethernet Switch ...
Страница 13: ...Chapter 1 Switch Description Key Technical Specifications 13 ...
Страница 24: ...Chapter 3 Switch Chassis Switch Cooling Requirements 24 ...
Страница 28: ...Chapter 4 Power and Grounding How to Connect to AC Power 28 ...