
Chapter 2
| Installation Overview
Switch Installation Tasks
– 16 –
Connect AC Power to Power On
Connect the power cord to the AC socket on the switch and to a grounded, 3-pin,
AC power source.
Go to the chapter
Figure 4: Connecting AC Power
Verify Switch Operation
Verify basic switch operation by checking the system LEDs.
When operating normally, the PWR and DIAG LEDs should both be on green. If any
of the LEDs are on amber, see
“Diagnosing LED Indicators” on page 46
Go to the section
“Understanding the System Status LEDs” on page 42
Task 3
Supplied AC Power cord.
Connect an external AC power source
to the AC power socket of the switch
using the supplied AC power cord.
1
2
1
2
Task 4
Содержание ECS3510-26P
Страница 1: ...Installation Guide www edge core com ECS3510 26P 26 Port Layer 2 Gigabit Ethernet Switch ...
Страница 13: ...Chapter 1 Switch Description Key Technical Specifications 13 ...
Страница 24: ...Chapter 3 Switch Chassis Switch Cooling Requirements 24 ...
Страница 28: ...Chapter 4 Power and Grounding How to Connect to AC Power 28 ...