14.4 Annual Shut Down Procedure
1.
Turn off gas to boiler as described in “To Turn Off Gas
To Appliance” Section 13.3 page 24.
2.
If heating system is to remain out of service during
freezing weather and does not contain antifreeze, drain
system completely. If boiler will be exposed to freezing
temperatures, drain condensate lines.
14.5 Annual Examination And Cleaning Of Boiler
Components
1.
Following service procedures must be performed by
qualifi ed service agency. Boiler owner should not
attempt these steps.
2.
Before servicing, turn off electrical power to boiler at
service switch. Close manual gas valve to turn off gas
supply to boiler.
3.
Examine fl ue passages by removing blower/burner
assembly from casting. Procedure for examining and
cleaning the burner is described below.
4.
Clean any buildup of sediment or aluminum oxide (white
powdery or fl aky substance) in fl ue passages as follows:
A. Remove jacket front and top panels.
B. Confi rm manual gas valve is closed and disconnect
gas line to gas valve at union. Disconnect pressure
switch hoses to gas valve and air inlet.
C. Disconnect wires to gas valve and igniter.
D. Loosen but do not remove fi ve nuts attaching
blower adapter assembly to boiler.
E. Remove two igniter screws and carefully remove
igniter.
F. Remove
fi ve nuts and remove blower adapter
assembly, burner, and gaskets.
14 - MAINTENANCE AND CLEANING
G. Aluminum oxide deposits are water soluble and
may be rinsed away by inserting hose into burner
opening of casting and slowly run water through
fl ue side of boiler and out condensate drain. Debris
rinsed away by this method will exit through
condensate drain. Be wary of drain lines getting
clogged and causing water to back up in the bottom
of casting.
H. Use fl exible handle nylon brush to loosen sediment
and aluminum oxide on all accessible heating
surfaces of boiler. Take care not to get brush stuck
in heat exchanger.
I. After brushing and rinsing, remove any remaining
loosened sediment using shop vacuum with snorkel
attachment.
J. Inspect burner for any foreign matter in fl ame
ports or inside burner. Remove any foreign matter
by blowing with compressed air or vacuuming. If
burner cannot be cleaned, it must be replaced.
K. Reinstall burner and gaskets and position blower
adapter assembly over studs. Install fi ve nuts do
not tighten. Reinstall igniter and igniter gasket
and fasten with two screws. Tighten fi ve nuts
holding blower adapter assembly.
L. Connect gas line to gas valve, pressure switch hose
to gas valve and air inlet assembly, igniter wires,
and gas valve wires.
5.
Inspect condensate trap. Clean out any foreign material
visible in condensate lines.
A. Inspect for sediment or blockage.
B. Flush out with water or vacuum.
C. Follow instructions in, “Filling Condensate Trap With
Water.”
6.
Inspect fl ue connector.
A. Loosen clamp on vent tee side of 2” fl exible
coupling that connects vent tee to exhaust port.
B. Inspect interior of vent tee. Clean any buildup of
sediment on inside surface.
C. Reconnect 2” fl exible coupling to vent tee.
NOTICE
Verify proper operation after servicing.
NOTICE
Perform regular service and maintenance by qualifi ed
service agency at least once every 12 months to
assure safe, trouble free operation and maximum
effi ciency.
WARNING
Following service procedures must be performed by
qualifi ed service agent. Boiler owner shall not attempt
these steps. Failure to do so could result in death or
serious injury.
!
26
Содержание Olsen OQ95M-200
Страница 2: ...1 DIMENSIONS OPENING FOR SAFETY RELIEF VALVE DISCHARGE PIPE 30 785mm 39 1 1m 18 458mm 2 ...
Страница 27: ...APPENDIX A BOILER PIPING AND WIRING Electrical Wiring Diagram 27 ...
Страница 49: ...49 NOTES ...
Страница 50: ...50 NOTES ...
Страница 51: ...51 Company Address Phone Company Name Tech Initials Service Performed Date SERVICE RECORD ...
Страница 52: ...ECR International 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com ...