2)
Make the ceiling opening needed for installation where
applicable.(For existing ceilings.)
- Create the ceiling opening required for installation.From the
side
of the opening to the casing outlet, implement the
refrigerant
drain piping and wiring for remote controller
(unnecessary for wireless type). Refer to each piping or wiring
section.
- After making an opening in the ceiling, it may be necessary to
reinforce ceiling beams to keep the ceiling level and to prevent
it
from vibrating. Consult the builder for details.
3)
Install the installation hooks. (Use either a M8 or M10 size
bolt. )
Use expansible hooks, sunken anchors or other field supplied
parts to reinforce the ceiling in order to bear the weight of the
unit. Adjust clearance from the ceiling before proceeding further.
Installation example see figure below.
1 Ceiling slab
2 Expansible hook (optional)
3 Installation hook (optional)
4 False ceiling
5
Installation is possible with a ceiling dimension of 600 mm
/ 23.6in(marked with * ) . However,to achieve a
ceiling-panel overlapping dimension of 15 mm / 0.6in, the
spacing between the ceiling and the unit should be 20 mm
/ 0.8in or less.If the spacing between ceiling and the unit
is over 20 mm / 0.8in, attach sealing material in the part
or recover the ceiling.
NOTE:
1 Indoor unit
2 False ceiling
1
2
24
m
m
0.
9i
n
1
1
2
2
3
3
545/21.5in
52
3/
20
.6
in
570/22.4in
57
0/
22
.4
in
647/25.5in
64
7/
25
.5
in
4
5
70/2.8in
15/0.6in
15/0.6in
600/23.6in
6
7
8
20/0.8in
20/0.8in
1 Installation hook
2 Indoor unit dimensions
3 decoration panel dimensions
4 Refrigerant piping
5 Installation hook (
×
4)
6 Ceiling opening dimensions
7 Hanger bracket
8 False ceiling
pitch dimensions
Adjust the position to ensure the gaps between the indoor
unit and the four sides of false ceiling are even. The indoor
unit's lower part should recess into the false ceiling
24mm /
0.9in
.
1.2 Preparations before installation
Relation of ceiling opening to unit and suspension bolt
position.
1)
Unit: mm
30
~
35
m
m
1.
2~
1.
4i
n
1
2
3
4