2
INSTRUCTIONS
ESM / ERM Series Water Conditioner / Refiner
Conditioner Models
, ,
, ,
& E
Refiner Models
&
TABLE OF CONTENTS
Page
Safety Guides . . . . . . . . . . . . . . . . . . . . . 2
Installation Requirements . . . . . . . . . . . . 2
Installation Illustrations . . . . . . . . . . . . . . . 3
Conditioner/Refiner Programming . . . . 4-6
Adding Salt . . . . . . . . . . . . . . . . . . . . . . . . 7
Sanitizing . . . . . . . . . . . . . . . . . . . . . . . . . 7
Troubleshooting . . . . . . . . . . . . . . . . . . . . 7
EcoWater Systems Europe
=
www.ecowater-europe.com
A detailed manual can be obtained from your local dealer or from the EcoWater website in your country.
SAFETY GUIDES
=
Before beginning installation, read the manual and obtain
tools and materials needed.
=
The installation must conform to local plumbing and
electrical codes.
=
Use only lead-free solder and flux for all sweat solder
connections.
=
Handle the conditioner/refiner with care. Do not turn upside
down, drop, or set on sharp protrusions.
=
Do not locate the conditioner/refiner:
-
where freezing temperatures may occur.
-
in direct sunlight.
-
where it may be exposed to wet weather.
=
Do not attempt to treat water over 49°C.
=
The conditioner/refiner requires a minimum water flow of 11
liters per minute at the inlet.
=
Maximum allowable inlet water pressure is 8.6 bar. If daytime
pressure is over 5.5 bar, nighttime pressure may exceed the
maximum. Use a pressure reducing valve if necessary.
=
This system works on 24 volt, 50/60 Hz electrical power only.
Be sure to use the transformer and plug it into a nominal
230V, 50 Hz household outlet that is in a dry location only,
grounded and properly protected by an over current device
such as a circuit breaker or fuse.
=
This system is not intended to be used for treating water that
is microbiologically unsafe or of unknown quality without
adequate disinfection before or after the system.
European Directive 2002/96/EC requires all electrical
and electronic equipment to be disposed of according
to Waste Electrical and Electronic Equipment
(WEEE) requirements. This directive or similar laws
are in place nationally and can vary from region to
region. Please refer to your state and local laws for
proper disposal of the equipment.
INSTALLATION REQUIREMENTS
=
Installation should only be performed by a trained professional.
=
Make sure that the main water supply is shut off before
starting installation.
=
Always install either an EcoWater Systems bypass valve or a
3-valve bypass system. Bypass valves allow you to turn off
water to the conditioner/ refiner for repairs if needed, but still
have water in house pipes.
=
A drain is needed for recharge discharge water. A floor drain
is preferred, close to the EcoWater Systems conditioner/refiner.
A laundry tub, standpipe, etc., are other options.
=
A 230V, 50 Hz, grounded, continuously “live” electrical outlet
is needed, in a dry location within 2 meters of the EcoWater
Systems conditioner/refiner.
=
After completing installation of the system, perform a
pressure test to detect any leaks.
=
After completing pressure test, perform a manual recharge.
English