1. RECOMMENDATIONS 
 
-  This  Electrical  Boiler  is  not  intended  for  use  by  persons  (including  children)  with  reduced 
physical,  sensory  or  mental  capabilities,  or  lack  of  experience  and  knowledge,  unless  they 
have been given supervision or instruction concerning use of the Electrical Boiler by a person 
responsible for their safety.  
- Children should be supervised to ensure that they do not play with the Electrical boiler. 
- It is necessary one to be familiar and to observe the safety operation and assembly manual. 
-

 

Electrical  boiler  has  IP  20  protection  degree,  which  applies  after  an  installation  at  place 

where it will used. 
- After unpacking the boiler, check delivery integrity and equipment.. 
- Check whether the boiler type corresponds to your needs. 
- It is recommendable for each assembly a project to be drafted. 
- The assembly may be carried out only by and expert authorized for such activity. 
- Boiler assembly should meet the effective prescriptions, norms and to the present manual. 
- Connection of the boiler to the power network (if necessary) should be harmonized with the 
local  power  supplier,  which  should  be  done  by  the  consumer  prior  to  the  purchase  of  the 
boiler. 
- Adjustment and commissioning should be carried out only by a service technician approved 
by the producer. 
- Upon incorrect assembly, damages may occur and the producer shall not be liable thereof. 
- In case of failure contact the service organization. Unprofessional intervention may damage 
the boiler. 
- For correct functioning, safety and long-term operation secure prophylactics at least once a 
year. 
-  In  case  of  damages  incurred  by  unprofessional  assembly,  as  well  as  upon  noncompliance 
with the regulations and the operation manual, the producer is not liable and shall not provide 
guarantee service. 
- The heating installation should have air bleeds at all necessary places.  
- It is not allowed to make any changes whatsoever on the electrical diagram of the product, 
except  for  connection  of  the  indoor  temperature  controller,  the  equithermal  controller  or  at 
telephone control. 
-  Hydraulic  and  warm  tests  should  be  carried  out  of  each  heating  installation  upon 
commissioning. 
- The electric boiler may operate at open system up to temperature of 95

o

C max and at closed 

system up to 110

o

C at pressure of 1.8 bar in a self-contained heating circuit. 

- The assembly organization is obliged to get the client familiar with the operational rules of 
the heating system as a whole. 
 
 
2. INTRODUCTION 
 
The  flow-through  electric  boiler  ECOTERMAL  is  a  modern  ecological  source  of  heat 
designated  for  story  and  central  heating  of  small  and  average  size  houses  and  production 
facilities.  The  main  advantages  of  heating  with  electric  power  are  mostly  cost  effectiveness, 
high  efficiency,  environmental  friendliness  and  compactness.  Electric  boiler  can  be  used  in 
every system of central or story (local) heating in a direct, accumulating or hybrid system. It 
can be integrated also in existing heating systems, in parallel with solid fuel boiler (exemplary 
diagrams  are  shown  on  Fig.  1  and  2,  page  6).  It  is  recommended  for  safer  operation  the 
electric boilers to be mounted in systems operating with a pump securing enforced circulation 
of the heat medium. 

Содержание 10 K

Страница 1: ...WITH RELAY CONTROL PASSPORT OF ELECTRIC BOILER WITH RELAY CONTROL ECOTERMAL MR 6 8 10 12 15 22 30 kW MX 37 45 52 60 KW MODULE 6 8 10 12 15 22 30 37 45 52 60 KW Bourgas 8000 47 Slivnitsa Str tel 056 81...

Страница 2: ...l heating Fig 1 6 9 2 Method of connecting the system to a solid fuel boiler Fig 2 6 9 3 Structure of the electric boiler from 6 to 30 kW Fig 3 7 9 4 Structure of the electric boiler from 37 to 60 kW...

Страница 3: ...d long term operation secure prophylactics at least once a year In case of damages incurred by unprofessional assembly as well as upon noncompliance with the regulations and the operation manual the p...

Страница 4: ...of the fault causing the thermostat switch off Room Temperature Control Operating Mode The room temperature controller is installed in the premise where you need the temperature to be precisely contr...

Страница 5: ...GUARANTEE MAINTENANCE GENERAL TERMS The electrical boiler module is mounted with the help of consoles only on a wall that can bear its weight The boiler location should be selected in a manner to sec...

Страница 6: ...Expansion tank 5 Circulation pump 6 Water filter Fig 1 Method of connecting the system to a solid fuel boiler 1 Safety valve by temperature 7 Return valve 2 Air bleeder 8 Water filter 3 Shut off valv...

Страница 7: ...irculation Pump 4 Automatic breaker 12 Control Panel with additional protection 13 Pressure gauge Valve 5 Emergency blocking thermostat 14 Expansion Tank 6 Air bleeder 15 Thermostat Pocket 7 System co...

Страница 8: ...Circulation Pump 4 Automatic breaker 12 Control Panel with additional protection 13 Pressure gauge Valve 5 Emergency blocking thermostat 14 Power Wires 6 Air bleeder 15 Thermostat Pocket 7 System con...

Страница 9: ...by pressure 2 5 bar 10 Heaters 4 Automatic breaker 12 Control Panel with additional protection 13 Pressure gauge Valve 5 Emergency blocking thermostat 15 Thermostat Pocket 6 Air bleeder 16 Thermostat...

Страница 10: ...2 5 bar 10 Heaters 4 Automatic breaker 12 Control Panel with additional protection 13 Pressure gauge Valve 5 Emergency blocking thermostat 14 Power Wires 6 Air bleeder 15 Thermostat Pocket 7 System c...

Страница 11: ...n LED Indication Second Stage ON 3 Green LED Indication First Stage ON 4 Button First Stage OFF when it is pressed 5 Pressure gauge 6 LED Indication of activated emergency thermostat 7 Potentiometer o...

Страница 12: ...ermostat X5 is connected to the circulation pump X7 is connected to normally open contact of the first relay X1 is connected by ribbon cable to the control panel Boiler temperature sensor is connected...

Страница 13: ...13 Boiler Module 6 30 kW Fig 9 Boiler Module 37 60 kW Fig 10...

Страница 14: ...eaker A 6 8 7 5 x 2 5 10 8 11 6 5 x 2 5 16 10 14 5 3 x 2 5 1 5 1 4 20 12 17 4 3 x 4 2 5 1 4 25 15 21 8 3 x 4 2 5 1 6 32 22 31 25 3 x 6 4 1 x10 50 30 43 5 3 x 10 6 1 10 63 37 53 6 3 x 10 6 1 16 1 x 50...

Страница 15: ...2 33 0 22 22 24 0 30 MR 30 35 0 30 30 26 0 37 MX 37 48 0 37 37 45 0 45 MX 45 49 0 45 45 46 0 52 MX 52 50 0 52 52 47 0 60 MX 60 52 0 60 60 49 0 Tab 5 Equipment of the boilers models Model EQUIPMENT MR...

Отзывы: