- 11 -
CONTROL PANEL 6 ÷ 60 kW
Fig.7
1.
Digital Display
2.
Green LED Indication– Second Stage ON
3.
Green LED Indication– First Stage ON
4.
Button - First Stage OFF (when it is pressed)
5.
Pressure-gauge
6.
LED Indication of activated emergency thermostat
7.
Potentiometer of boiler’s temperature
8.
Button – set/current temperature