background image

 

 

06.11.2018 Rev. 08 

11 

 
 
 

5.

 

INSTALLATION 

 

5.1.

 

Burner Installation Picture 

 

 

Installation on the Boiler 

 

Ø

 

In the installation of the burner, please only use the installation materials supplied with the burner.

 

 

Ø

 

Make sure that there are no gaps between the flange and boiler cover and ensure a full sealing by a 
gasket.

 

 

 

 

 

Make sure that, when installing burner at tree pass boilers, the end point of flame pipe should be on 

the same plane with the cover insulation material.  
 

   

Asphalt plant application 

 

 

 

      

Содержание ECO 300

Страница 1: ...ev 08 www ecostar com tr DUOBLOCK DUAL FUEL GAS HEAVY OIL BURNERS INSTALLATION OPERATING AND MAINTENANCE MANUAL MODULATING OPERATION ECO 250 ECO 300 ECO 350 ECO 400 ECO 450 ECO 500 ECO 600 ECO 700 ECO...

Страница 2: ...you encounter any issue that is not explained clearly in this manual or you could not understand please contact with our service department We thank you for choosing ECOSTAR brand Ecostar Dual Fuel Ga...

Страница 3: ...r Dimensions 10 5 INSTALLATION 11 5 1 Burner Installation Picture 11 6 COMMISSIONING 12 6 1 General Controls 12 6 2 Combustion Adjustment 13 6 3 Air Pressure Switch Adjustment 16 6 4 Servomotor Adjust...

Страница 4: ...ectrical voltage Product handling information PF Impulse connection detecting combustion chamber pressure PL Impulse connection detecting combustion air pressure PBR Impulse connection detecting burne...

Страница 5: ...epairs concerned with safety elements should be carried out only by the manufacturing company The device should never be used by children mentally handicapped and inexperienced persons Children must n...

Страница 6: ...mper connections must be checked to ensure that they are free running in spite of immobility and oil freezing In case of two piece flame tubes of ECO 450 and upper combined burner models being demount...

Страница 7: ...roduct in its original packaging until the installation stage Incorrect and poor electrical connections Failures due to incorrect voltage applications frequent repetition of voltage fluctuations Any d...

Страница 8: ...d burner pressure ranges 3 1 Purpose of Use and Work Limits of Burners This product works at any load value equivalent to its max capacity or covered by its capacity range In hot water and steam boile...

Страница 9: ...06 11 2018 Rev 08 8 Temperature change of fuel used in ECOSTAR Dual Fuel Gas Heavy Oil burners dependent on viscosity...

Страница 10: ...509 1 1290 2 ECO 500 1 16 2 13 900 000 1684 8 1440 4 ECO 500 2 17 8 15 300 000 1854 5 1585 5 ECO 500 3 19 4 16 650 000 2018 2 1725 4 ECO 600 1 20 8 17 900 000 2169 7 1854 9 ECO 600 2 23 4 20 150 000 2...

Страница 11: ...06 11 2018 Rev 08 10 4 2 Burner Dimensions...

Страница 12: ...use the installation materials supplied with the burner Make sure that there are no gaps between the flange and boiler cover and ensure a full sealing by a gasket Make sure that when installing burne...

Страница 13: ...and combustion will occur Flame control system will start to flame control In modulating burner the burner goes into max capacity according to the signal from the modulating control unit When the boil...

Страница 14: ...13 6 2 Combustion Adjustment Photocell Check the photocell weekly Clean the dust or fume stains on the glass of photocell by a dry cloth QRA10 QRA2 Pilot Ignition System Pilot gas burner inlet pressu...

Страница 15: ...2018 Rev 08 14 HA D Nozzle 32 HA D is a needle closed lance with return line Shut down needle 4 make press to nozzle plate 6 through a spiral on pushing piston Shut down needle is opened by pneumatic...

Страница 16: ...06 11 2018 Rev 08 15 HA D Nozzle Hydraulic Diagram...

Страница 17: ...er will decrease and burner consumption will also decrease since nozzle pressure decreases 5 When the adjustment is completed make sure that the adjustment you have made is permanent by tightening the...

Страница 18: ...d CO 100 mg kWh 3 O2 5 NOx 170 mg kWh Excess air ratio 1 2 1 3 In emission measurements the following values are accepted as reference according to TS EN 267 standard CO 110 mg kWh 3 O2 5 NOx 250 mg k...

Страница 19: ...nlet manometer valve 8 Multi block safety and operation solenoids 5 Regulator 8 Multi block safety and operation solenoids 5 Regulator 10 max gas pressure switch 6 Outlet manometer valve 9 Sealing Con...

Страница 20: ...ent possible faults After completion of maintenance and adjustment processes make sure to perform a combustion analysis Clean the filters on the fuel line to the burner Clean fuel nozzle of the burner...

Страница 21: ...of electric motor Make surface cleaning of ignition electrodes and porcelains Replace cracked or broken porcelains Clean air fan and clamps Check the operating function Check cleanliness of the nozzl...

Страница 22: ...tocell may be faulty or contaminated Remove and clean Program relay failure Replace it with a new one Burner starts up but fails after 10 seconds Program relay failure Replace it with a new one Air pr...

Страница 23: ...06 11 2018 Rev 08 22 9 PERIODICAL FLUE GAS MEASUREMENT REPORT Fuel Consumption kg h Fuel Consumption m3 h CO ppm O2 CO2 ppm NOX ppm Yield Flue Temp C Date Signature...

Страница 24: ...T RK YE Tel 90 216 442 93 00 Fax 90 216 370 45 03 Factory Contact Details T rkg c OSB B lent Ecevit Bulvar No 11 ORLU TEK RDA T RK YE Tel 90 282 685 44 80 81 Fax 90 282 685 42 09 Also you can contact...

Страница 25: ...06 11 2018 Rev 08 24 11 NOTES Please record and forward your measurements and observations to us www ecostar com tr...

Отзывы: