Econex MPV Series Скачать руководство пользователя страница 7

 

7 of 11 

 

 

6.

 

AUXILIARY MICROSWITCHES 

 

On request, the valve can be equipped with 2 auxiliary microswitches that can be 
adjusted in any position. 
Microswitches are voltage-free. 
The contact capacity is 5 A/250 Vac with ohmic load and 1 A/250 Vac with inductive 
load. 
Contact rating is about 5 A/250 with Ohm load and about 1 A/250 with inductive load. 
For adjusting the cams of auxiliary microswitches, proceed as for cams of endswitches 
as indicated in paragraph 9.1 chapter 9 “CALIBRATIONS”. 

 
 
 

7.

 

POTENTIOMETER/S 

 

On request, the valve can be equipped with 1 or 2 independent potentiometers [pot. A 

and

/

or

 Pot. B] for the answer signal of the valve position. 

Resistance value of the potentiometer is indicated on the identification label. 
If the resistance value does not correspond to the wished one, proceed as indicated in 
paragraph 9.2 of chapter 9 «CALIBRATIONS». 
Absorbed power is 2 W for each potentiometer. 

 
 
 

8.

 

CONTROL STATION 

 

8.1

 

The control station enables the manual electric activation of the valve. 

 

8.2

 

Phase L must be connected to the terminal no. 4. 

 

8.3

 

The AUTO/MAN switch is delivered by the factory in AUTO position     .  

 

8.4

 

Set the AUTO/MAN switch in the manual position indicated by stylized hand  

 

8.5

 

Activate the Open/Stopped/Closed switch as follows: 

 

8.5.1

  Keeping the lever pushed towards the symbol 

 the valve opens [the cam S2 

adjusts the desired final opening position]. 

 

8.5.2

  Keeping the lever pushed towards the symbol 

 

the valve closes [the cam S1 

adjusts the desired final closing position]. 

 

8.5.3

  Positioning the lever to the centre, the valve motor is not activated. 

 

8.5.4

  ATTENTION: after the operations for manual electric activation of the valve, 

reset the AUTO/MAN switch onto AUTO

 

position  

    . 

Содержание MPV Series

Страница 1: ...IC CONNECTIONS 4 5 WIRING 5 5 1 WITHOUT MANUAL AUTOMATIC CONTROL STATION 5 5 2 WITH MANUAL AUTOMATIC CONTROL STATION 6 6 AUXILIARY MICROSWITCHES 7 7 POTENTIOMETER S 7 8 CONTROL STATION 7 9 CALIBRATION...

Страница 2: ...g conditions interchangeable without removing he valve from the plant WARNING Installation wiring adjustment and maintenance of gear motors must be carried out exclusively by skilled and authorized se...

Страница 3: ...ions 3 5 Remove the protection plugs installed on the valve body 3 6 The sealant must be applied only on the piping outer threading and not on the valve inner threading Use gas suitable sealants only...

Страница 4: ...es must comply with local prescriptions and in any case their section must be ranging between 1 and 1 5 mm2 Connection piping recommended H07V U G1 5 mm2 4 6 Wiring diagrams are reported in the attach...

Страница 5: ...ATION TERMINAL BOARD Terminal earthing Terminal N1 N neutral Terminal L2 by tension the valve closes Terminal 3 by tension the valve opens Terminal 4 for manual electric operation Terminal 16 answer s...

Страница 6: ...0 common contact from the auxiliary microswitch S3 Terminal 21 normally open contact of the auxiliary microswitch S3 Terminal 22 normally closed contact of the auxiliary microswitch S3 Terminal 23 com...

Страница 7: ...e does not correspond to the wished one proceed as indicated in paragraph 9 2 of chapter 9 CALIBRATIONS Absorbed power is 2 W for each potentiometer 8 CONTROL STATION 8 1 The control station enables t...

Страница 8: ...rst the lever on its curved side to move the blue cam to a more suitable position to perform adjustment picture 1 Picture 1 9 1 6 To calibrate refer to the mechanical position indicator disc the valve...

Страница 9: ...een terminals n 34 and 35 when the valve is closed picture 2 Picture 2 9 2 4 By rotating the potentiometer clockwise 3 the resistance value increases counter dock wise 4 the resistance value decreases...

Страница 10: ...echanically 9 3 7 Select the AUTO position 9 3 8 Set the adjustment device on 6 mA or on 2 Vdc and wait up the servocontrol moves then take it back to 4 mA or on 0 Vdc and check it reaches 0 degrees 9...

Страница 11: ...cock can be opened and the operating test can be carried out 11 MAINTENANCE AND CHECKS 11 1 The MPV valve does not require any special maintenance Both the valve body and the actuator do not need any...

Отзывы: