6
Picture 10 Installation overview with part numbering.
Installation
The system is intended to be installed vertically on a wall. The system is intended to be installed
vertically on a wall and will not work correctly if laying down.
Installation hardware is not included with the system, and customer will have to supply their own.
1
9
5
13
3
7
8
2
10
6
14
4
12
16
System process
The colored arrows in picture 12, indicates the flow direction of water through the system. For every color change
of the arrows the water/product undergoes a change. This change can be the addition of an additive or a chemical
change thought the use of electrolysis. Different colors are also used to indicate additives used in the process.
Process steps
1)
Blue color. The blue color is normal water before any changes are made. The water inlet splits up into two separate
streams. The water that goes into dosing unit 3 is a low flow rate. The main part of the water goes though dosing unit 5.
2)
Red color. The red color indicates the addition of the purple product (HCl). The HCl is added to the water in
dosing unit 3. The mix is stored in tank 4 and has a very low pH level at this point.
3)
Yellow color. The Yellow is a mix of red (HCl and water) and blue (water). The dosing unit 5 controls the amount
of concentrate (red) that is needed to produce the desired pH level in the final solution. Location 6 & 7 does
not
change the solution.
4)
Green color: The green color is the final HOCl product. The final solution is made by adding brine (brown arrow)
to the electrolysis cell inside the system.
11
15