Be sure to orient the
Base as shown with its
offset mounting hole
directed uphill. On the
Skirt row the Base can
be rotated 180 degrees
which helps hide the
Base behind the Skirt
(see examples below).
Install the Base using
the Lag Screw with its
pre-installed Sealing
Washer. Drive the Lag
Screw into the roof
structure securing the
Base and Flashing to the
roof top.
Torque to
14 ft-lbs to ensure seal.
Torque to: 14 ft-lbs
If necessary, clearance
trim the up-course
Shingles to clear the
Base.
Line up the Flashing’s
mounting hole to pre-
drilled pilot hole and
square the Flashing to
the Shingles.
The bottom or
downslope edge of
the Flashing must not
extend beyond the
course of Shingles that
it’s attached to.
4d. Place Flashing
4. Install Attachments onto Roof (cont.)
Slide Flashing
under uphill course
of Shingles
Use Flat Roofing Bar
to lift uphill Shingles
Align with Pilot
Hole/Chalk Line
Lag Screw with
Sealing Washer
If needed,
Notch shingles
to clear Base
Base
4e. Attach Base
Base can be rotated 360 degrees to
allow adjustability of Clamp position.
Rotates around its offset mounting hole.
Skirt row Base Position
It’s recommended to rotate the Base so its
offset mounting hole is downhill.
This helps hide the Base behind the Skirt.
Standard Base Position
Offset mounting hole
is uphill.
Base Positioning - Skirt Row vs other Rows
9 of 31
EcoX Gen2 Installation Guide, Rev 1.11
Содержание EcoX
Страница 1: ...EcoX Gen2 Installation Guide Rev 1 11 Installation Guide Gen2 ...
Страница 31: ...EcoX Gen2 Installation Guide Rev 1 11 26 of 31 11 Grounding and Bonding cont ...
Страница 32: ...EcoX Gen2 Installation Guide Rev 1 11 27 of 31 11 Grounding and Bonding cont ...
Страница 33: ...EcoX Gen2 Installation Guide Rev 1 11 28 of 31 11 Grounding and Bonding cont ...