![Ecolab GEOCENTER Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/ecolab/geocenter/geocenter_installation-and-operation-manual_2354466016.webp)
8.0 SerVIce
8.1 regular Inspection
1. Inspect the pump squeeze tube. If visible worn or
cracking, replace the squeeze tube even if it is working
properly at the time.
NOTE: Properly lubricate the tubing with the silicon
lubricant provided.
2. Inspect all tubing connections for leaks, cracks or loose
fittings. Tighten or replace as necessary.
8.2 Squeeze Tube replacement Instructions
1. Loosen tube nuts and pick-up discharge ends of squeeze
tube.
2. Remove the plastic cover from the face of the peristaltic
pump.
3. Pull both ends of the squeeze tube away from pump
body until tubes slips over the rollers.
4. Clean inside of pump body, wiping to remove particle
matter and accumulation of old lubricant.
5. Inspect the roller assembly closely for signs of wear or
cracking.
6. Slide the plastic fittings provided with the tubing inside
the pump housing. It may be beneficial to use a screw
driver and rotate the roller assembly clock-wise to assist
in the placement of the tubing.
7. Lubricate the new squeeze tube and rollers. Use only
silicon grease lubricant.
8. Replace the plastic cover on the face of the pump. DO
NOT over tighten since plastic can stress crack if excess
of force is applied.
9. Turn on final rinse to prime pick-up and discharge line and
to check proper function of the new squeeze tube.
Содержание GEOCENTER
Страница 2: ...This page intended to be blank...