
54
6.1.
Ash box. (Since they are all similar, model VAP24 will be used as an example).
Empty the ash box at the end of the season or after an alarm message (see
User manual
). To remove the ash
box, you have to first take out the through bolt. Please check the capacity of the ash box (
Technical
characteristics
).
Once the ash box has been emptied, put it back into place.
Warning:
the ash extraction system won’t work as long as the ash box is not in its intended position or the
cover is open, if the cover is open or badly closed, or if the sensor is in the wrong position.
Drawing 20
6.2.
Heat exchanger
To access the exchanger, we have to remove the lining’s top cover and the cover of the exchanger. Once we
have gained access from the top, we can remove the turbulator in two different ways. Before carrying out
the removal, please see section
10
TECHNICAL CHARACTERISTICS and check how much these elements
weigh. The same methods are used in all models.
6.2.1. Method 1.
Unscrew the cylinder positioner and remove the whole set.
Then, do the same with the helical coupler positioner.
Drawing 21
Ash box
Through bolt.
Lateral locks (2 units).
Exchanger top lining.
Heat exchanger cover
Set of posi exchanger cylinders.
Set of posi exchanger helical couplers.
Содержание Vap 24
Страница 6: ...5 COTAS MEASUREMENTS DIMENSIONS MISURE MEDIDAS VAP 30 CG30 UNE EN 303 5 ...
Страница 16: ...15 5 5 Montaje del sistema de limpieza de cestillo y conexión eléctrica VAP24 CV Figura 4 ...
Страница 46: ...45 5 5 Assembly of the burning pot cleaning system and electrical connection VAP24 CV Drawing 4 ...
Страница 75: ...74 Schéma 4 VAP 5 20 CW Schéma 5 ...
Страница 133: ...132 Figura 4 VAP 5 20 CW Figura 5 ...
Страница 154: ...153 9 ESQUEMA ELÉCTRICO ELECTRICAL DRAWING SCHEMA ELÉCTRIQUE SCHEMA ELETTRICO ESQUEMA ELÉCTRICO VAP30 ...
Страница 156: ...155 11 ESQUEMA ELÉCTRICO ELECTRICAL DRAWING SCHEMA ELÉCTRIQUE SCHEMA ELETTRICO ESQUEMA ELÉCTRICO VAP24 VAP 5 20 ...