IMNL
-
003.181008
© Ecoflo Wastewater Management Pty Ltd
Page 10
STEP 3: Constructing the liquid drain absorption trench
Place the plain end of the 19mm lilac liquid
drain hose through the small hole in the rear of
the fibreglass toilet shell. Feed the hose
through until the liquid drain valve connection
side is resting just on the inside of the shell
near the hole.
The hose exiting through the hole in the shell
should lead through the hole previously cut into
the bathroom wall and out towards the absorp-
tion trench.
Construct the excess liquid drain absorption
trench as per the following diagrams.