04.12.2020 Rev. 00
14
8.2.
Assembly of Condensing Fluid Drain
1.
Ensure that siphon is fully filled with water before activation of boiler.
2.
Drain direction must allow flow of condensing fluid. Drain pipe must be planned to prevent any
clogging due to external effect like frost, etc. Drain parts must be plastic.
3.
Boiler condensing outlet must be at least 13 mm.
Condensing drain must not be changed or clogged after assembly. Clogging of condensing drain
causes the boiler to automatically shut down or causes the siphon to overflow. It will be helpful to
pour some hot water to the open parts of drain if there is a possibility of frost. Drain must be open
at all times to ensure proper functioning of the boiler.
Содержание WT-S DHW 45 H
Страница 8: ...04 12 2020 Rev 00 7 3 CONDENSING BOILER GAS FLUE GAS AND HEATING WATER SCHEMA WT S DHW SERIES...
Страница 9: ...04 12 2020 Rev 00 8 4 CIRCUIT SCHEMES WT S DHW SERIES...
Страница 11: ...04 12 2020 Rev 00 10 6 TECHNICAL DATA 6 1 Capacity Table...
Страница 19: ...04 12 2020 Rev 00 18 10 ELECTRICAL DIAGRAM AND RELATED CONNECTIONS WT S DHW...
Страница 20: ...04 12 2020 Rev 00 19...
Страница 21: ...04 12 2020 Rev 00 20...