background image

6

Repair Instructions

To Change Valves

Remove nuts (49A). Take off the valve casing (43) or push the drive end back. Screw off nut (46L). Remove 

disc (46N), guard ring (46M). Using a plastic hammer, disassemble valve (46) by tapping the valve retainer 

pin (46O) on the front.  Change O-ring (47) and Support Ring (47A) in the valve casing (43). Take the old seal-

ing Ring (46F) out of the Valve Casing (43).  Fit the new valve (46) in reverse order.

To Change Plunger Set

Unscrew the 8 nuts (49A) and pull the valve casing off to the front or push the drive end back. Position every 

plunger to the top dead centre. Unscrew the plunger pipe at the hexagon turning at least ten times. Take off 

holding screw (1A). Pull the plunger set (29) out of the guides in the crankcase. Take Tolerance disc (32F) out 

of the middle bore, and put in a new Tolerance disc.  Fit the new plunger set in reverse order  .The contact 

surfaces on the plunger (25) and in the drive (1) must be clean. Coat thread (M10) on the Plunger with Anti 

Seize.

Important!   

Deformation of the plunger pipe due to eccentric tightening of the tension screw or dirt or dam-

age on the front surface can cause accelerated wear or the plunger pipe to fracture.

Tighten the valve casing fixing nuts (49A) crosswise and evenly.

Important!

 If the cover plate (3) has been removed, coat the thread of its screw (3B) with glue when refitting.

To Dismantle Gear

Remove the 8 nuts (49A) and pull the valve casing off to the front or push the drive end back.  Disassemble 

the plunger set (29).  Screw off gear cover (4) and bearing cover (14).

Remove conrod screws (24) and push the front conrod parts as far as possible into the crosshead guide. Cut 

the roller bearing cages open and remove the roller parts.  Turn the crankshaft lightly and carefully hit it out to 

one side using a rubber hammer.

Important!

  Do not bend conrod shanks. Check the running surfaces on the roller bearings, crosshead and 

seal surfaces (shaft, plungers).

To Reassemble

After removing the inner ring from casing bearing (20), thread new cages onto the crankshaft and click new 

roller parts into place. Thread on the outer rings. Press on the inner ring from casing bearing (20). Thread in 

the crankshaft and screw the conrods together.

Using a soft tool, press in the casing bearing outer rings until these lie flat with the outer edge of the bearing 

hole.  Lubricate all bearings with grease.  Then screw on the bearing cover together with the radial shaft seal 

and O-ring. Push in the bearing outer ring together with the bearing cover. Fit shim 20D on both sides. Fit 

shims (20A,B,C) symmetrically.

Adjust axial bearing clearance to at least 0.2 mm and maximum 0.3 mm.  All bearing points lubricate with 

grease.   After assembly the shaft should have a clearance of between 0.2 mm and 0.3 mm. Tighten conrod 

screws. Conrod must be movable on the crank pin. Rotate Crankshaft after assembling 2 turns by Hand.

 

Pump Mounting Selection Guide

Bushings

06496 

- 35mm H Bushing

Pulley & Sheaves

07165 

- 12.75” Cast Iron - 4 gr. - AB Section

Rails

07357

 - Plated Steel Channel Rails 

 

(L=11.75”xW1.88”xH=3.00”)

Содержание CLP124

Страница 1: ...3 Specifications page 4 Exploded View page 5 Parts List page 5 Repair Instructions page 6 Pump Mounting Selection Guide page 6 Dimensions page 7 Warranty Information back page Triplex Ceramic Plunger Pump Operating Instructions Repair and Service Manual Model CO2 Circulation pump ...

Страница 2: ...ally voids the warranty When the pump is in operation the shaft end must be covered by shaft guard 21 and the driven shaft side and coupling by a protective cover Fit shaft guard 21 using shaft guard holder 21A and screws 17 Pressure in the discharge line and in the pump must be at zero before any maintenance work to the pump and unit takes place Close off the suction line Take necessary precautio...

Страница 3: ...3 Exploded View CLP124 ...

Страница 4: ... PSI 300 BAR Maximum Power Consumption 40 BHP 30 kW Minimum Power Consumption 4 BHP 3 kW Maximum Speed 1000 RPM Plunger Diameter 0 94 24 mm Stroke 1 57 40 mm Inlet Port 2 x 1 1 2 BSP Discharge Port 2 x 1 BSP Crankshaft Mounting Either Side Shaft Rotation Top of Pulley Towards Fluid End Weight 183 lbs 83 kg Crankshaft Diameter 1 38 35mm ...

Страница 5: ...uard 1 21A CP05377 Shaft Guard Holder 1 22 CP04814 Crankshaft Assembly 1 ITEM PART DESCRIPTION QTY 23 CP13243 Fitting Key 1 24 CP04810 Connecting Rod Assembly 3 25 CP04815 Crosshead w Plunger 3 26 CP04816 Crosshead Sleeve 3 27 CP04817 Clip Ring 3 28 CP04818 Crosshead Pin 3 28A CP04819 Needle Bush 6 29 CP04820 Plunger Kit 1 31 CP07624 Radial Shaft Seal 3 43 CP04821 Valve Casing 1 43A CP04822 Restri...

Страница 6: ...o the front or push the drive end back Disassemble the plunger set 29 Screw off gear cover 4 and bearing cover 14 Remove conrod screws 24 and push the front conrod parts as far as possible into the crosshead guide Cut the roller bearing cages open and remove the roller parts Turn the crankshaft lightly and carefully hit it out to one side using a rubber hammer Important Do not bend conrod shanks C...

Страница 7: ...7 CLP124 DIMENSIONS MM INCHES ...

Страница 8: ...he product as a component part 5 Changes or modifications made by the customer or third party 6 The operation of pumps and or accessories exceeding the specifications set forth in the Operations Manuals provided by ECO2 Blast Liability under this warranty is on all non wear parts and limited to the replacement or repair of those products returned freight prepaid to ECO2 Blast which are deemed to b...

Отзывы: