background image

JINECI05 Rev. E. 11/11/2014 

TECHNICAL SPECIFICATION:   Eco-ideal Inset 5 MKII 

 

 

 

ECO-IDEAL INSET 5 MKII 

Hunter Stoves, Emperor Way, 

Exeter Business Park, Exeter, 

Devon. EX1 3QS 

BS/EN 13229 

UKAS# 0692 

Stove Mass: 100 kg 

NOMINAL OUTPUT: 4.9 KW 

CO Emission at 13% O

2

: 0.19% 

Mean Flue Gas Temperature: 292°C 

EFFICIENCY: 77.1% 

Flue Gas Mass Flow: 4.3 g/s 

Minimum clearance to combustible material 

Top of Fire Surround: 

200mm 

Side of Fire Surround: 

150mm 

Side Wall: 

300mm 

This appliance is suitable for intermittent burning 

This appliance is not suitable for use in a shared flue 

Read and follow the operating instructions 

Use only recommended fuels 

 

This stove has been designed and assembled so that it may be used to burn wood logs in a Smoke Control 
Area.   
 
Find out if you are in a Smoke Control Area by contacting your Local Authority. 
 
The Eco-ideal Inset 5 has been fitted with a permanent bypass that prevents closure of the secondary air 
slider. Removal of this will lead to the appliance potentially causing smoke emissions. Without the permanent 
bypass in place the appliance is not an exempt appliance and so may leave the householder liable for a fine up 
to £1000. 

                                                                                      

A

PPLIANCE 

D

IMENSIONS

 

 
 
 

 

 
 
 
 
 
 

Rear of Stove showing the Flue Infill Plate 
(Standard Supply Configuration) 

12 

Содержание CVSECI05FM

Страница 1: ...1 JINECI05 Rev E 11 11 2014 Eco Ideal Inset 5 MKII Model CVSECI05FM Instructions for Installation Operation Maintenance Servicing Approved for use in the United Kingdom and the Republic of Ireland...

Страница 2: ...els Consumables are deemed to be Glass Seals Gaskets Grate Components Log Retainers Baffles and the surface finish of the appliance The Warranty will only be valid if the appliance is installed by an...

Страница 3: ...on or near this appliance Do not place furniture or other items within 1 metre of the front of this appliance See the note on material clearances on page 13 Extractor Fans and or Cooker Hoods must not...

Страница 4: ...mes FUME EMISSION Properly installed and operated this appliance will not emit fumes Occasional fumes from de ashing and refueling may occur Persistent fume emission must not be tolerated This applian...

Страница 5: ...in steadily and to give a long service life of the paint finish During this curing in process you may notice an unpleasant smell It is non toxic but for your comfort we would suggest that during this...

Страница 6: ...rols open Allow the fuel to reach a steady glow and build the fire up gradually Once you have a good fire established across the grate bed further fuel can be added as required LOADING THE APPLIANCE W...

Страница 7: ...and adjust the secondary air to give the desired heat output Never leave the stove unattended until you are certain that the flames are fully established Avoid refuelling on to a low fire bed as this...

Страница 8: ...otland and Wales this power rests with Ministers in the devolved administrations for those countries Separate legislation the Clean Air Northern Ireland Order 1981 applies in Northern Ireland Therefor...

Страница 9: ...itable for use in a shared flue Read and follow the operating instructions Use only recommended fuels This stove has been designed and assembled so that it may be used to burn wood logs in a Smoke Con...

Страница 10: ...ing the chimney flue system Make provision to access the chimney flue system for cleaning and the removal of debris If there is no existing chimney then either a prefabricated block chimney in accorda...

Страница 11: ...satisfactory installation of the stove although detail may need slight modification to suit particular local site conditions In all cases the installation must comply with current Building Regulation...

Страница 12: ...way It is essential that all connections between the stove and chimney flue are sealed and made airtight Both the chimney and any flue pipe must be accessible for cleaning and if ANY parts of the chi...

Страница 13: ...retainer by lifting the right hand side until it will clear the opening and remove 3 Remove the catch bar front plate by lifting the right hand side until it will clear the opening and remove 4 Remove...

Страница 14: ...k 7 Unscrew the 2 M6 Screws and remove the Turbo Bars 8 Pull the top edge of the Lower Side Bricks forward and remove You will now be able to remove the Lower Rear Brick 9 You can now remove the Side...

Страница 15: ...the hearth or paintwork on the stove and making sure that the 12mm rope seal is compressed forming a tight seal between the stove and fireplace 4 Drill into the existing fireback through the fixing ho...

Страница 16: ...appliance to heat up slowly ensuring that no products of combustion enter into the room When the appliance has reached working temperature open the Door and carry out a spillage test using a smoke ma...

Страница 17: ...ese can scratch the glass and make subsequent cleaning more difficult Wet logs on heated glass a badly aimed poker or heavy slamming of the doors could crack the glass panels The glass will not fractu...

Страница 18: ...cleaner if required If the Gasket is torn or damaged we recommend that is replaced to ensure that no products of combustion enters the room when the appliance is used Brush down the outer surface and...

Страница 19: ...S AND STOVE CARE Single Door Assembly Single Door HCE09008 Glass Clip HHR08146 Glass Clip Screw FSJM05008SS Single Door Glass HCE09102 Single Door Gasket HCE09101 Door Handle Assembly HCE09ARRT043S Ro...

Страница 20: ...ouble Door Glass HCE09031 Double Door Gasket HCE09030 Right Hand Door HCE09009 Rope Sealing Kit SCPCB900DDRSK Glass Clip HHR08046 Glass Clip Screw FSJM05008SS Double Door Glass HCE09031 Double Door Ga...

Страница 21: ...rs Side CNN05004 A B Upper CNS04013 Lower CNS04012 Ashpan HCN05ARRT033 Operating Tool HFR07040 Secondary Air Control Support Plate HCN05050 Slider Plate HH06086 Gasket HH06088 Slider Shaft HCN05016 Sl...

Страница 22: ...e Appliance Description Serial Number COMMISSIONING CHECK Complete Sign YES NO Does the chimney flue system meet the appropriate standard Has the chimney flue system been swept and passed the soundnes...

Страница 23: ...ervicing Company Engineer Signature 9th Service Date of Service Date of next Service Servicing Company Engineer Signature 2nd Service Date of Service Date of next Service Servicing Company Engineer Si...

Страница 24: ...24 JINECI05 Rev E 11 11 2014...

Отзывы: