15
JINECI05 Rev. E. 11/11/2014
12.
Slide the cam to the left until the right hand
side is clear of the hole, then raise one side
and swing out through the door opening.
13.
Remove the ash barrier by sliding out of the
stove.
INSTALLING THE STOVE
1.
Unpack the stove.
2.
Remove internal components.
3.
Move the stove into position inside the
fireplace opening being careful not to damage
the hearth or paintwork on the stove and
making sure that the 12mm rope seal is
compressed forming a tight seal between the
stove and fireplace.
4.
Drill into the existing fireback through the
fixing holes in the body, (see below) using a
6mm drill bit.
5.
Place the screws provided into the fixing holes
and gently tighten until the stove feels secure.
6.
Fill the fixing holes with fire cement to form an
airtight seal.
7.
Seal the area where the throat meets the flue
outlet of the stove with fire cement.
8.
Refit the internal components.
FIXING HOLES
Rear View
FIXING HOLES
Front View
Содержание CVSECI05FM
Страница 24: ...24 JINECI05 Rev E 11 11 2014...