![Eco Engineering Easypell 16 Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/eco-engineering/easypell-16/easypell-16_installation-manual_3989578015.webp)
Notes on bringing the unit into the building
15
Minimum clearance dimensions required
Note:
To install the heating system properly and ensure economical operation, you need to make sure that mini-
mum clearance dimensions indicated below are observed when setting up the boiler.
In addition, make sure that legislation in your country is complied with relating to the minimum clea-
rance of the flue gas tube.
a
Min. clearance of flue gas con-
nection from wall or part of
building
450 mm
b
Min. clearance of side of boiler
from wall or part of building
200 mm
c
Min. clearance of front of boiler
from wall or part of building
700 mm
d
Min. clearance of side of burner
from wall or part of building
300 mm
e
Min. room height
1950 mm
Note:
Legislation in your country must be observed!
Placement of rubber plates
The pellet heating boiler must be placed on the supplied
rubber plates.
Installation Manual Easypell 16 — 32kW
Содержание Easypell 16
Страница 1: ...Installation Manual Easypell 16 32kW ENGLISH 200014_EN 1 2 www easypell com...
Страница 18: ...18 Dismantling the burner casing and burner 200014_EN 1 2...
Страница 55: ...Retrofit motor cleaning device 55 14 2 Retrofit motor cleaning device Installation Manual Easypell 16 32kW...
Страница 56: ...56 Retrofit motor cleaning device 200014_EN 1 2...
Страница 57: ...Retrofit motor cleaning device 57 Installation Manual Easypell 16 32kW...
Страница 63: ......