Eclipse BoostPak Leak Detection Option, V3, Installation Guide 630-LD 7/30/2010
Commissioning
Preliminary
This section supplements the commissioning section in
your Installation Guide 630.
■
120 VAC power to annunciation panel must be
turned off and locked out prior to servicing panel.
Operational Tests
Test the operation of the BoostPak and verify:
• Leak detector responds to test gas
• Automatic SSOV closes when second alarm
(factory preset at 50%LEL) is activated.
• Optional customer wired equipment operates as
intended at first and second alarm points
Commissioning Record
Nameplate Information
Leak Detect Module Serial Number ___________
Annunciation Control Panel Serial Number ___________
Mechanical Installation
Ambient Temperature ___________
Panel Mounting Secure, Rigid, Level ___________
Conduit Properly Supported ___________
Proper and Adequate Detector Location ___________
Leak Detector Performance
Alarm A Test Gas Response ___________
Alarm B Test Gas Response ___________
Customer Interface Test Response ___________
I certify this equipment is installed per the requirements of
the manufacturer a nd that it is performing to its
specifications.
By: ____________________________
Date: ____________________________