Eckerle Industrie-Elektronik GmbH
, Otto-Eckerle-Strasse 12A, D – 76316 Malsch/Germany
Tel +49 (0)7246-9204-0 Fax +49 (0)7246-9204-44
www.eckerle.com
- 20 -
With one of the duct fixing
screws, fix the anti-wrenching
cable support (strain relief).
Connect the elliptical detection
reservoir to the a/c unit’s drain
tank,
according
to
recommendations in chapter 2. Fit
the
ventilation
tube
onto
the
detection block and position the
pump and detection unit in the
elbow.
Fix
the
pump
and
detection unit with the Velcro
strips.
Connect
to
the
pump
the
discharge
tube.
The
hydraulic
discharge connection uses flexible
tube having an inside Ø6 mm.
The
electric
cable
must
be
attached to the anti-wrenching
support with a cable tie.
Pre-form the refrigerant tubes and
position them in the duct. Support
the
tubes
with
the
mounting
flanges provided.
Before closing the duct, it is advised to support the power cable and the
discharge tube between the insulation of the refrigerant tubes, so that they
do not touch the walls and the lid of the duct. This process will help to
decrease the noise level of the installation.