![Echo SRM-22GES Скачать руководство пользователя страница 12](http://html.mh-extra.com/html/echo/srm-22ges/srm-22ges_operators-manual_531726012.webp)
12
SRM-22GES
ASSEMBLING
FRONT (LOOP) HANDLE INSTALLATION
• Position handle in comfortable operating position and
tighten screws (M5
×
35).
Front (loop) handle
Screw M5
×
35
WARNING
CUT OFF KNIFE ON DEBRIS SHIELD HAS SHARP
EDGES. AVOID CONTACT WHEN INSTALLING OR
REMOVING LINE HEAD.
PLASTIC SHIELD INSTALLATION
(For Nylon Line Operation)
NOTE
The plastic shield is for use with the Nylon Line Head
only. Install Metal Shield when using plastic or metal
blades.
1. Remove plastic sleeve from output shaft.
2. Install the shield on the bottom of the bearing housing
flange.
3. Place shield plate on shield, align holes and install three
screws (M5
×
16).
NYLON LINE HEAD INSTALLATION
(Use with Plastic Shield)
1. Be sure upper adapter plate remains on output shaft.
2. Align locking hole in upper plate with notch in edge of
gear housing and insert head locking tool.
3. Thread line head onto shaft by turning it anticlockwise
until head is tight against upper plate.
4. Remove head locking tool.
Screw M5
×
16
Shield plate
Cut off knife
Shield
Plastic sleeve
Locking tool
Nylon line head
Output shaft
Upper plate
CAUTION
Fasten output shaft using locking tool securely in
order to avoid the possibility of output shaft
rotating when mounting nylon line head.
Содержание SRM-22GES
Страница 23: ...23 SRM 22GES MEMORANDUM ...