![background image](http://html.mh-extra.com/html/echo/ms-5/ms-5_operators-manual_532430006.webp)
6
O
PERATION
Always conduct a test using clean water before mixing chemicals.
1.
Prior to each use of sprayer, check all connections (i.e.: hose,
shutoff handle, extension, etc.) to make certain they are firmly
secured.
2.
Lightly lubricate pump rod near the rod seal grommet to seal and
increase the life of rod and grommet.
3.
When mixing chemicals, follow package label instructions. Mix
chemicals in a separate container.
4.
Make sure shutoff control is in OFF position.
5.
Remove filler cap – leave filter screen in place to prevent sediment
and particles from entering the tank. Fill sprayer to desired level.
6.
Replace filler cap – make sure cap is tight.
7.
Clean spilled material from sprayer before use.
8.
Mount sprayer on back and adjust shoulder straps and waist belt
to fit comfortably.
High Pressure Chamber Operation
9.
Work pump handle up and down approximately 6-8 times to
pressurize sprayer reservoir. The pump handle will become hard to
move when you reach maximum pressure. To maintain pressure,
pump handle occasionally (approximately every other step while
walking and spraying). If using pressure regulator, adjust to
desired pressure at this time.
10. You are ready to start spraying. Press shutoff lever up and down
for intermittent spraying. Hold lever up and engage lock to provide
continuous spraying. Adjust nozzle for desired spray pattern.
Low Pressure Chamber Operation
11. Pump handle 1~3 times to reach initial operating pressure, then
again as needed. The low pressure bladder maintains constant
pressure and eliminates the need for a pressure regulator. DO NOT
OVERPRESSURIZE THE INTERNAL BLADDER.
Содержание MS-5
Страница 10: ...10 NOTES ...
Страница 11: ...BACKPACK SPRAYER OPERATOR S MANUAL 11 NOTES ...