14
X7504220703
© 10/2013 ECHO Inc.
ASSEMBLY
EA-410
ASSEMBLY
Throttle Handle Assembly
1. Cut and remove one (1) white plastic shipping tie that
secures handle assembly to packing materials.
Note: DO NOT cut or remove black plastic ties.
2. Remove mounting screw and hex nut from throttle handle
assembly, and slide throttle handle onto mounting bar.
3. Align hole in throttle handle assembly with hole in bar.
4. Secure throttle handle to bar with screw and hex nut.
5. Tighten securely.
Auger Installation
1. Carefully place engine on a flat surface with muffler side
down.
2. Remove assembly hardware from auger.
3. Slide auger assembly onto gear case PTO shaft.
4. Align PTO shaft mounting hole with auger mounting hole.
5. Secure auger to PTO shaft with hardware provided, and
tighten securely.
Note: Six, 8, & 10 in. Earth Augers hardware style shown in
illustration. Two, 3, & 4 in. Earth augers and 8 & 10 in. Ice
Augers use socket head screws only.
Parts Required:
Throttle Handle Assembly, Screw, Hex nut.
Parts Required:
Auger Blade Assembly - Includes: 6 - 10 in. Earth
Auger: 3/8-16 x 1- 1/2" Bolt, 3/8-16 Hex Nut,
2 - 4 in. Earth Augers: 3/8-16 x 1- 1/4" Socket
Head Screw, 8 - 10 in. Ice Augers: 3/8-16 x
1- 1/4" Socket Head Screw
Содержание EA-410
Страница 33: ...EA 410 NOTES 10 2013 ECHO Inc X7504220703 33 NOTES...
Страница 34: ...34 X7504220703 10 2013 ECHO Inc NOTES EA 410...
Страница 35: ...EA 410 NOTES 10 2013 ECHO Inc X7504220703 35...
Страница 36: ...ECHO INCORPORATED 400 Oakwood Road Lake Zurich IL 60047 www echo usa com 36 S05503001001 S05503999999...