background image

 

 

Run one of the high-pressure hoses from the output of the HP pump (O ring sealed fitting) to the O ring 
sealed fitting at the end of the membrane that is marked IN. 

 
A minimum hose length of 3 feet/1M is required for pulsation dampening.  The hose can be coiled 
where needed. 
 

Run the second high-pressure hose from the outlet of the RO membrane housing to the pressure control 
valve in the control panel. Do not over tighten the high pressure fittings.  They are O-ring sealed and 
need little torque to lock only. 

  

PRODUCT WATER TUBING

  

  
Connect the product water tubing from the center fitting(s) of the membrane housing(s) to the bottom 
inlet  of  the  flow  meter,  in  the  control  panel.    Connect the  tubing  from  each  output  port  of  the  3-way 
valve to your water tank and to the taste/test station of your choice. 
  

CAUTION:  UNDER  NO  CIRCUMSTANCES  SHOULD  THE  PRODUCT  WATER  LINE  BE 
ALLOWED TO BECOME BLOCKED WHILE THE SYSTEM IS RUNNING. 
DO NOT INSTALL SHUT-OFF VALVES ANYWHERE IN THIS LINE.  
  
CAUTION: DO NOT ALLOW CHLORINATED WATER FROM YOUR STORAGE TANK TO 
FLOW BACK INTO THE R.O. MEMBRANE. 

  
You  may  directly  “T”  your  product  water  line  into  the  tank  vent  (Refer  to  the  Flow  Diagram).    This 
avoids  chlorinated

 

water  to  back  flow  from  your  water  tanks  into  the  R.O.  membrane  and  does  not 

require a new fitting in your tank.   

  

When using a spigot as the taste/test station, be sure you have no shut-off valves in the product water 
line.  A hand pump style spigot, with a check valve 

only

, is acceptable.  If using this type of spigot for 

two  sources,  install  a  low-pressure  check-valve  in  the  product  line  and  “T”  it  into  the  existing  hand 
pump spigot line.  
 

  

REJECT WATER TUBING/HOSE 

  

Connect  the  outlet  of  the  pressure  control  valve  on  the  control  panel  with  a  reject  thru-hull  of  your 
choice (preferably above the water line).  
 

HARDENER / pH NEUTRALIZER KIT

 

 

Install  the  hardener  /  pH  neutralizer  housing  at  a  serviceable  location  in  line  with  the  product  water 
tubing  from  the  diverter  valve  on  the  control  panel  to  the  freshwater  storage  tank.  Observe  the  flow 
direction indicated on the housing.  

 

 

THRU-HULL (not supplied) 

 

The boat’s designated intake thru hull should be located in an area that will always be in the water with 
the boat is used under normal running conditions. 
A speed boat scoop could be helpful.  Installed with the opening facing the bow, it typically generates a 
small amount of pressure while moving through the water.  It is important not to place the scoop thru-
hull directly forward of a speedometer pickup.  It is also wise not to place the intake thru-hull slightly 
aft or outboard of a holding tank, head or galley sink overboard discharge.

 

Содержание Watermakers 200-BMS-1

Страница 1: ...NUAL Pages 2 INTRODUCTION 3 SPECIFICATIONS 4 5 STANDARD SYSTEM FEATURES OPTIONS AND ACCESSORIES 6 FLOW DIAGRAM 7 9 INSTALLATION INSTRUCTIONS 10 INSTALLATION INSTRUCTIONS OPTIONS 11 13 SYSTEM OPERATION...

Страница 2: ...st products on the market The purpose of this manual is to allow you to become familiar with each component of your new ECH2O Tec Watermaker By understanding the function importance and normal operati...

Страница 3: ...rated performance is tested at 26 C 80 F water temperature and 33g NaCl ltr RO MEMBRANE TYPE Standard size high rejection TFC Polyamide thin film composite spiral wound single pass reverse osmosis ele...

Страница 4: ...gh pressure gauge 1 Product flow meter 25 50 100gph 1 Diverter 3 way valve 1 Breaker 10amp or 2 Breakers 10 amp with optional boost pump 6 1 Hardener pH neutralizer kit with mineral element and 2pcs 3...

Страница 5: ...al cartridge stainless steel bracket 8 screws shut off valve 2 x 5 8 hose barb connectors 10ft 1 2 braided hose 4 x 1 2 hose clamps Low pressure gauge The low pressure gauge indicates when the pre fil...

Страница 6: ...ermakers DATE 31 05 06 REV 3 1 DRWN MS BOOST PUMP FRESH WATER FLUSH FILTER FILTER STRAINER FILTER PUMP FILTER 5 20 PSI PSI FLOW REJECT WATER REJECT WATER OUTLET CLEANING STORAGE SOLUTION INTAKE R O ME...

Страница 7: ...ld only do the electrical installation Connect the wire of the magnetic clutch to the system switch on the control panel Supply 12V DC to the switch This wire needs to be protected by a 10A fuse When...

Страница 8: ...h storage valve is supplied connect the 3 4 hose fitting on the tee to the bottom intake fitting of the high pressure pump INSTALL ALL PLUMBING TO ELIMINATE ANY AIR POCKETS IN THE SYSTEM CAUTION USE A...

Страница 9: ...your water tanks into the R O membrane and does not require a new fitting in your tank When using a spigot as the taste test station be sure you have no shut off valves in the product water line A han...

Страница 10: ...plied nylon nipple to the standard filter housing and reconnect the reinforced vinyl hose The 5micron cartridge has to be installed as the second filter in flow direction 5MICRON PRE FILTER HOUSING WI...

Страница 11: ...Switch on the boost pump optional and the electro magnetic clutch 7 Flush the air out of the system Check the brine discharge at the output location Caution Never allow any leaks in your hose or tube...

Страница 12: ...ow rate of your vessel s fresh water system pump 6 Close the seawater intake valve MEMBRANE STORAGE PROCEDURE If you intend to store your watermaker for more than 7 days growth of microorganism will d...

Страница 13: ...bel CAUTION Do not mix different cleaning chemicals together Do not use different cleaning chemicals together at the same time Mix the cleaning chemicals separately and use them separately Note All cl...

Страница 14: ...applicable When brushes are worn out High pressure pump Change crankcase oil Change packing seals and O rings Initial change after 50 hrs Every 200 operating hours or 6 months Every 5000 hrs or 2 year...

Страница 15: ...s inner wall and remove it in one fast pull 6 Inspect the end plug for hairline cracks or damages on the O rings and O ring grooves 7 Pull the membrane on the product pipe out of the pressure vessel o...

Страница 16: ...recommended lubricant SAE 90 gear box oil non detergent Check inlet lines for restrictions and or proper size Check strainer and filter s Inability to build up pressure Discharge valve chamber has ai...

Страница 17: ......

Страница 18: ...16B and copper gasket 16D and clean the old Locktite from the plunger bolt 16C and plunger base 16A Replace the plunger with the new one and Locktite the plunger bolt and torque to 120 inch pounds NOT...

Страница 19: ...s 12A and 12B if they were removed from the crankshaft Be certain the bearings are pressed all the way onto the shaft and completely into the crankcase Replace radial shaft seal 11 bearing cover with...

Страница 20: ...s Service Center The purchaser must pay any transportation or labor expenses incurred in removing and returning the product A return authorization must be obtained before any part or component is ship...

Страница 21: ...nger of the Reverse Osmosis Membrane Element s fouling or drying out Therefore we can ship your system without the Membrane s This allows you to install the system at the appropriate time in your sche...

Отзывы: