background image

HIGH PRESSURE PUMP REPAIR INSTRUCTION 

SERIES EP-12-34 / EP-14-34 / EP-17-34 

 

Disassembly sequence of the front end of the ECH

2

O Tec. high-pressure pump. 

Refer to the pump diagram. 

 

1)

 

Remove the three discharge valve plugs and the three inlet valve plugs (32), with a 22 mm socket 

wrench.  Inspect the O-ring (33) for wear and replace if damaged. 

 
2)

 

With  needle  nose  pliers,  remove  the  inlet  and  discharge  valve  assemblies  (32X).    Insert  a  small 

screwdriver  between  the  valve  seat  (27)  and  the  valve  spring  retainer  (30)  to  separate  the  valve 
assembly.  Remove the O-ring (31).  Inspect all parts for wear and replace if necessary. 

 
3)

 

Next, use a 5 mm Allen wrench to remove the 8 socket head cap screws (34).  Carefully slide the 

valve casing (26) out over the plungers.  Remove the weep return ring (25), pressure ring (24) and 
V-sleeve with support ring (23), from the valve casing (26). Remove the V-sleeve (23) from the seal 
case (20).  Inspect all parts, including O-ring (21) for wear and replace if necessary. 

 
4)

 

Check  surfaces  of  plunger  (16).    A  damaged  surface  will  cause  accelerated  wear  on  the  seals.  

Deposits of any kind must be carefully removed from the plunger surface.  

 

A damaged plunger must be replaced! 

 
5)

 

If the ceramic plunger (16B) is damaged, remove the plunger bolt (16C).  Discard the old plunger 

(16B) and copper gasket (16D) and clean the old Locktite from the plunger bolt (16C) and plunger 
base (16A).  Replace the plunger with the new one and Locktite the plunger bolt and torque to 120 
inch-pounds. 

 

NOTE: If there are deposits of any kind (i.e., lime deposits) in the valve casing, be certain that the 
weep holes in the weep return ring and valve casing have not been plugged. 
 

6)

 

If the crankcase oil seals (19) are to be replaced, they can be removed by prying loose.  Take care 

not to make contact with the plunger.  If the oil seals are not to be replaced, proceed to the back end 
disassembly sequence and carefully pry the seals loose after the plungers have been removed from 
the crankcase.  

 

Disassembly sequence of the back end of the ECHO Tec. high-pressure pump. 
 

1)

 

Before beginning, drain the oil from the crankcase, through the oil drain (3A). 

 
2)

 

Remove the crankcase cover (3) and O-ring (4) from the crankcase (1).  To remove the crankshaft 

(13), remove the bearing cover (7) and sight glass (8).  Using a rubber mallet, remove the crankshaft 
axially through the connecting rods by tapping on the end of the shaft.  Do not bend or damage the 
connecting rods during crankshaft removal. 

 
3)

 

Next remove the remaining bearing and radial shaft seal (11).  Inspect both bearings and seal for 

wear and replace if necessary. 

4)

 

Remove the connecting rod (15), then the plunger (16) and wrist pin (17), if necessary.  Check the 

plunger bore in the crankcase for wear.  Inspect parts and replace as necessary. 

Содержание 200-AMS-1

Страница 1: ...EM FEATURES OPTIONS AND ACCESSORIES 6 FLOW DIAGRAM 7 9 INSTALLATION INSTRUCTIONS 10 INSTALLATION INSTRUCTIONS OPTIONS 11 12 SYSTEM OPERATION SHUT DOWN AND FLUSH PROCEDURE 13 MEMBRANE CLEANING PROCEDUR...

Страница 2: ...st products on the market The purpose of this manual is to allow you to become familiar with each component of your new ECH2O Tec Watermaker By understanding the function importance and normal operati...

Страница 3: ...ce is tested at 26 C 80 F water temperature and 33g NaCl ltr RO MEMBRANE TYPE Specifically selected high rejection proprietary TFC Polyamid thin film composite spiral wound single pass reverse osmosis...

Страница 4: ...uct flow meter 25 50 100gph 1 Diverter 3 way valve 1 Breaker 20amp 230V or 30amp 115V or 2 Breakers like above and 5 amp with optional boost pump 6 15 feet 4 5 meter high pressure hose with 2 x 316 hi...

Страница 5: ...al cartridge 316 bracket 8 screws shut off valve 2 x 5 8 hose barb connectors 10ft 1 2 braided hose 4 x 1 2 hose clamps Low pressure gauge The low pressure gauge indicates when the pre filters have to...

Страница 6: ...ermakers DATE 31 05 06 REV 3 1 DRWN MS BOOST PUMP FRESH WATER FLUSH FILTER FILTER STRAINER FILTER PUMP FILTER 5 20 PSI PSI FLOW REJECT WATER REJECT WATER OUTLET CLEANING STORAGE SOLUTION INTAKE R O ME...

Страница 7: ...all other components and hoses tubes are completely assembled remove the caps on the high pressure fittings and the blue sealed tube from the product water outlet on the membrane housing s and then f...

Страница 8: ...a 20foot length so it may be cut to suit your needs Leave a little extra length of hose Never bend the high pressure hose tighter than a 4 10cm radius Assembly instructions for the 316 stainless steel...

Страница 9: ...ted water to back flow from your water tanks into the R O membrane and does not require a new fitting in your tank When using a spigot as the taste test station be sure you have no shut off valves in...

Страница 10: ...impeller magnet assembly This assembly rotates on a stationary spindle and up against a thrust washer These are the only parts that can wear and may need to be replaced 5 MICRON PRE FILTER HOUSING Co...

Страница 11: ...er valve to sample position 5 Switch on the boost pump optional 6 Switch on the high pressure pump 7 Flush the air out of the system Check the brine discharge at the output location Caution Never allo...

Страница 12: ...If you intend to store your watermaker for more than seven days growth of micro organism will degrade the RO membrane s performance The RO membrane s should be flushed with a biocide solution This wi...

Страница 13: ...Do not use different cleaning chemicals together at the same time Mix the cleaning chemicals separately and use them separately Note All cleaning and preserving procedures can be done with either sea...

Страница 14: ...trainer Inspect and clean screen and housing 100 hrs or when clogged Pre filters s Replace element s and clean housing s 200 hrs or when clogged suction higher than 3 Hg Carbon flush filter Replace el...

Страница 15: ...gear box oil non detergent Check inlet lines for restrictions and or proper size Check strainer and filter s Inability to build up pressure Discharge valve chamber has air trapped within it Allow mor...

Страница 16: ...16B and copper gasket 16D and clean the old Locktite from the plunger bolt 16C and plunger base 16A Replace the plunger with the new one and Locktite the plunger bolt and torque to 120 inch pounds NOT...

Страница 17: ...s 12A and 12B if they were removed from the crankshaft Be certain the bearings are pressed all the way onto the shaft and completely into the crankcase Replace radial shaft seal 11 bearing cover with...

Страница 18: ......

Страница 19: ...s Service Center The purchaser must pay any transportation or labor expenses incurred in removing and returning the product to the service center The limited warranty does not extend to any system com...

Страница 20: ...lete with Reverse Osmosis Membrane Element s However if the ECHO Tec System will not be put to use within 9 months of shipment there is a potential danger of the Reverse Osmosis Membrane Element s fou...

Отзывы: