background image

 

 

 

 
 
 
 
 
 

MODULAR SERIES  (230V AC   50Hz)  

 

200-AMS-1 / 400-AMS-2 / 500-AML-1   
600-AMS-3 / 800-AMS-4 / 900-AML-2  

1200-AML-3 / 1500-AML-4 

 

OWNERS MANUAL 

 
 

 

 

PAGE 

 

INTRODUCTION  

SPECIFICATIONS 

4-5 

STANDARD SYSTEM FEATURES, OPTIONS AND ACCESSORIES 

FLOW DIAGRAM 

7-9 

INSTALLATION INSTRUCTIONS  

10 

INSTALLATION INSTRUCTIONS OPTIONS 

11-12 

SYSTEM OPERATION, SHUT DOWN AND FLUSH PROCEDURE 

13 

MEMBRANE CLEANING PROCEDURE  

14 

MAINTENANCE TIMETABLE 

15 

TROUBLESHOOTING GUIDE 

16-18 

HIGH PRESSURE PUMP REPAIR INSTRUCTION  

19-20 

WARRANTY 

 

 

E

E

E

E

C

C

C

CH

H

H

H

2

2

2

2

O  Tec.

O  Tec.

O  Tec.

O  Tec.

 

 

TM 

 

Watermakers

 

Содержание 200-AMS-1

Страница 1: ...EM FEATURES OPTIONS AND ACCESSORIES 6 FLOW DIAGRAM 7 9 INSTALLATION INSTRUCTIONS 10 INSTALLATION INSTRUCTIONS OPTIONS 11 12 SYSTEM OPERATION SHUT DOWN AND FLUSH PROCEDURE 13 MEMBRANE CLEANING PROCEDUR...

Страница 2: ...st products on the market The purpose of this manual is to allow you to become familiar with each component of your new ECH2O Tec Watermaker By understanding the function importance and normal operati...

Страница 3: ...ce is tested at 26 C 80 F water temperature and 33g NaCl ltr RO MEMBRANE TYPE Specifically selected high rejection proprietary TFC Polyamid thin film composite spiral wound single pass reverse osmosis...

Страница 4: ...uct flow meter 25 50 100gph 1 Diverter 3 way valve 1 Breaker 20amp 230V or 30amp 115V or 2 Breakers like above and 5 amp with optional boost pump 6 15 feet 4 5 meter high pressure hose with 2 x 316 hi...

Страница 5: ...al cartridge 316 bracket 8 screws shut off valve 2 x 5 8 hose barb connectors 10ft 1 2 braided hose 4 x 1 2 hose clamps Low pressure gauge The low pressure gauge indicates when the pre filters have to...

Страница 6: ...ermakers DATE 31 05 06 REV 3 1 DRWN MS BOOST PUMP FRESH WATER FLUSH FILTER FILTER STRAINER FILTER PUMP FILTER 5 20 PSI PSI FLOW REJECT WATER REJECT WATER OUTLET CLEANING STORAGE SOLUTION INTAKE R O ME...

Страница 7: ...all other components and hoses tubes are completely assembled remove the caps on the high pressure fittings and the blue sealed tube from the product water outlet on the membrane housing s and then f...

Страница 8: ...a 20foot length so it may be cut to suit your needs Leave a little extra length of hose Never bend the high pressure hose tighter than a 4 10cm radius Assembly instructions for the 316 stainless steel...

Страница 9: ...ted water to back flow from your water tanks into the R O membrane and does not require a new fitting in your tank When using a spigot as the taste test station be sure you have no shut off valves in...

Страница 10: ...impeller magnet assembly This assembly rotates on a stationary spindle and up against a thrust washer These are the only parts that can wear and may need to be replaced 5 MICRON PRE FILTER HOUSING Co...

Страница 11: ...er valve to sample position 5 Switch on the boost pump optional 6 Switch on the high pressure pump 7 Flush the air out of the system Check the brine discharge at the output location Caution Never allo...

Страница 12: ...If you intend to store your watermaker for more than seven days growth of micro organism will degrade the RO membrane s performance The RO membrane s should be flushed with a biocide solution This wi...

Страница 13: ...Do not use different cleaning chemicals together at the same time Mix the cleaning chemicals separately and use them separately Note All cleaning and preserving procedures can be done with either sea...

Страница 14: ...trainer Inspect and clean screen and housing 100 hrs or when clogged Pre filters s Replace element s and clean housing s 200 hrs or when clogged suction higher than 3 Hg Carbon flush filter Replace el...

Страница 15: ...gear box oil non detergent Check inlet lines for restrictions and or proper size Check strainer and filter s Inability to build up pressure Discharge valve chamber has air trapped within it Allow mor...

Страница 16: ...16B and copper gasket 16D and clean the old Locktite from the plunger bolt 16C and plunger base 16A Replace the plunger with the new one and Locktite the plunger bolt and torque to 120 inch pounds NOT...

Страница 17: ...s 12A and 12B if they were removed from the crankshaft Be certain the bearings are pressed all the way onto the shaft and completely into the crankcase Replace radial shaft seal 11 bearing cover with...

Страница 18: ......

Страница 19: ...s Service Center The purchaser must pay any transportation or labor expenses incurred in removing and returning the product to the service center The limited warranty does not extend to any system com...

Страница 20: ...lete with Reverse Osmosis Membrane Element s However if the ECHO Tec System will not be put to use within 9 months of shipment there is a potential danger of the Reverse Osmosis Membrane Element s fou...

Отзывы: