D. ELECTRICAL HOOK-UP
1. Wire entry into the unit should be
made through the knockout in the
bottom of the cover.
2. Cover End Cap must be removed
to allow installation and inspection
of proper wiring. (Verify correct
installation in accordance with
diagram on page 2 of this manual
prior to wiring unit for proper
operation).
3. Proper connectors should be chosen
for the wire/conduit selected.
4. Connect properly sized copper leads
to the terminal block as shown.
5. Connect the power circuits to L1 and
L2 as shown and the ground to GND.
(For 120V models connect the Neutral
to L2/N on the terminal block).
PRE-POWER CHECK:
1. Verify that all connections are secure.
2. Verify that an adequate ground has
been properly connected.
3. Verify that adequate sized breakers
have been properly connected.
Remember that breakers that are
too large are more dangerous that
breakers that are too small.
4. Verify proper wire size has been used
for connection.
5. Check voltage at the terminal block
for each circuit.
THIS INSTALLATION MUST BE DONE BY A QUALIFIED AND LICENSED CONTRACTOR.
Refer to your local electric and plumbing codes for additional information.
VERIFY PROPER INSTALLATION PRIOR TO WIRING UNIT (SEE DIAGRAM ON PAGE 2)