Eccotemp EP-2.4 Скачать руководство пользователя страница 5

D. ELECTRICAL HOOK-UP

1.  Wire entry into the unit should be 

made through the knockout in the 
bottom of the cover.

2.  Cover End Cap must be removed   

to allow installation and inspection 
of proper wiring. (Verify correct 
installation in accordance with 
diagram on page 2 of this manual 
prior to wiring unit for proper 
operation).

3.  Proper connectors should be chosen 

for the wire/conduit selected.

4.  Connect properly sized copper leads 

to the terminal block as shown.

5.  Connect the power circuits to L1 and 

L2 as shown and the ground to GND. 
(For 120V models connect the Neutral 
to L2/N on the terminal block).

PRE-POWER CHECK:

1.  Verify that all connections are secure.

2.  Verify that an adequate ground has 

been properly connected.

3.  Verify that adequate sized breakers 

have been properly connected. 
Remember that breakers that are 
too large are more dangerous that 
breakers that are too small.

4.  Verify proper wire size has been used 

for connection.

5.  Check voltage at the terminal block 

for each circuit.

THIS INSTALLATION MUST BE DONE BY A QUALIFIED AND LICENSED CONTRACTOR.

Refer to your local electric and plumbing codes for additional information.

VERIFY PROPER INSTALLATION PRIOR TO WIRING UNIT (SEE DIAGRAM ON PAGE 2)

Содержание EP-2.4

Страница 1: ...nline Eccotemp com products Store Locator Eccotemp com locator 866 356 1992 support eccotemp com 315 A Industrial Road Summerville SC 29483 ECCOTEMP Point of Use Tankless Water Heaters EP 2 4 EP 7 0 I...

Страница 2: ...referred service center does not already have Eccotemp service information Eccotemp will promptly provide the necessary information to the service center on request For information regarding service c...

Страница 3: ...e sure the bracket is level and in the proper orientation If mounting to a hollow wall care should be taken to locate a stud or to use appropriate hollow wall anchors After mounting the bracket slide...

Страница 4: ...er 5 Install ball valves on the inlet and outlet pipes to allow isolation of the heater for service Be sure both valves are open prior to activating the heater 6 Recommended operating pressure is 60 t...

Страница 5: ...shown and the ground to GND For 120V models connect the Neutral to L2 N on the terminal block PRE POWER CHECK 1 Verify that all connections are secure 2 Verify that an adequate ground has been proper...

Страница 6: ...ed application 2 If the design or structure of the Eccotemp heater is modified or altered in any way 3 If appliances or equipment not approved by Eccotemp are attached to the water heater 4 If the wat...

Страница 7: ...Point of Use Models can also be connected to the HOT water line at the point of use to provide hot water sooner than is possible from the main hot water source located in a central location a longer d...

Страница 8: ...uit board and verify the power connections are tight If stranded wire is used check that all strands are inside the lug Tests with Power ON Verify circuit breakers are turned on and verify power to th...

Страница 9: ......

Страница 10: ...nline Eccotemp com products Store Locator Eccotemp com locator 866 356 1992 support eccotemp com 315 A Industrial Road Summerville SC 29483 ECCOTEMP Point of Use Tankless Water Heaters EP 2 4 EP 7 0 I...

Отзывы: