B. PLUMBING HOOK-UP

1.  The unit is supplied with 3/4” NPT fittings molded into the heating 

chamber. DO NOT USE PIPE DOPE OR PVC PRIMER OR GLUE ON THE 
FITTINGS. DO NOT USE A TORCH ON ANY FITTING CONNECTED TO THE 
HEATER. Use only TEFLON TAPE on the threads ensuring that no tape or 
debris enters the heater.

2.  If an adapter is required to reduce fitting size, use the enclosed adapter 

with O- ring. No additional sealants or teflon tape is required. For other 
adapters, be sure to use 3/4 NPT fittings and seal with TEFLON TAPE 
ONLY. Connect plumbing to the adapters with teflon tape. 

3.  3. Flex-pipe is recommended for ease of installaIon and service. Where 

fixed pipe is used, a plumbing union is recommended for ease of service.

4.  Always use two wrenches to tighten plumbing fittings to the heater to 

avoid stress to the fittings and heating chamber.

5.  Install ball valves on the inlet and outlet pipes to allow isolation of the 

heater for service. Be sure both valves are open prior to activating the 
heater.

6.  Recommended  operating pressure is 60 to 80 PSI. For installations with 

higher pressure a PRV is required. For installations above the ceiling or 
attic, a bleed air separator is recommended. Where water hammer exists, 
a properly sized arrestor should be installed.

7.  Run water through the unit for a few minutes until all visible air is purged 

from the lines and unit and the flow is continuous without spitting air.

NOTE: ALL PLUMBING MUST BE COMPLETED BEFORE STARTING ELECTRICAL HOOKUP 

TEST ALL CONNECTIONS FOR LEAKS BEFORE CONNECTING ELECTRICITY

C. COMMISSIONING THE UNIT

1.  Open all ball valves and turn on water outlets. 

2.  Activate power at breaker.

3.  Cycle the water on and off and verify unit operation.

4.  Verify temperature and adjust as necessary.

5.  If desired temperature is not reached, verify flow and sizing   

information to ensure adequately sized unit has been installed.

Содержание EP-2.4

Страница 1: ...nline Eccotemp com products Store Locator Eccotemp com locator 866 356 1992 support eccotemp com 315 A Industrial Road Summerville SC 29483 ECCOTEMP Point of Use Tankless Water Heaters EP 2 4 EP 7 0 I...

Страница 2: ...referred service center does not already have Eccotemp service information Eccotemp will promptly provide the necessary information to the service center on request For information regarding service c...

Страница 3: ...e sure the bracket is level and in the proper orientation If mounting to a hollow wall care should be taken to locate a stud or to use appropriate hollow wall anchors After mounting the bracket slide...

Страница 4: ...er 5 Install ball valves on the inlet and outlet pipes to allow isolation of the heater for service Be sure both valves are open prior to activating the heater 6 Recommended operating pressure is 60 t...

Страница 5: ...shown and the ground to GND For 120V models connect the Neutral to L2 N on the terminal block PRE POWER CHECK 1 Verify that all connections are secure 2 Verify that an adequate ground has been proper...

Страница 6: ...ed application 2 If the design or structure of the Eccotemp heater is modified or altered in any way 3 If appliances or equipment not approved by Eccotemp are attached to the water heater 4 If the wat...

Страница 7: ...Point of Use Models can also be connected to the HOT water line at the point of use to provide hot water sooner than is possible from the main hot water source located in a central location a longer d...

Страница 8: ...uit board and verify the power connections are tight If stranded wire is used check that all strands are inside the lug Tests with Power ON Verify circuit breakers are turned on and verify power to th...

Страница 9: ......

Страница 10: ...nline Eccotemp com products Store Locator Eccotemp com locator 866 356 1992 support eccotemp com 315 A Industrial Road Summerville SC 29483 ECCOTEMP Point of Use Tankless Water Heaters EP 2 4 EP 7 0 I...

Отзывы: