background image

Operating instructions

K3GA00-PV03-01

Translation of the original operating instructions

6. MAINTENANCE, MALFUNCTIONS, POSSIBLE
CAUSES AND REMEDIES

Do not perform any repairs on your device. Send the device to ebm-
papst for repair or replacement.

WARNING
Live terminals and connections even with device
switched off

Electric shock
→ Wait five minutes after disconnecting the voltage at all poles

before opening the device.

CAUTION
If control voltage or a stored speed set value is applied,
the motor will restart automatically, e.g. after a power
failure.

Risk of injury
→ Keep out of the device’s danger zone.# When working on

the device, switch off the line voltage and ensure that it
cannot be switched back on.

→ Wait until the device comes to a stop.
→ After working on the device, remove any tools or other

objects from the device.

If the device is out of use for over four months, we recommend
switching it on for at least four hours at full speed to allow any
condensation to evaporate and to move the bearings.

Malfunction/fault

Possible cause

Possible remedy

Impeller not
running smoothly

Imbalance in rotating
parts

Clean the device;
replace it if imbalance
persists after cleaning.
Make sure no
weight clips are
removed during
cleaning.

Motor not turning

Mechanical blockage

Switch off, isolate
from supply and
remove mechanical
blockage.

Line voltage faulty

Check line voltage,
restore power supply.
Attention! The error
message resets
automatically.
Device restarts
automatically without
warning.

Faulty connection

Isolate from supply,
correct connection;
see connection
diagram.

Broken motor winding Replace device

Deficient cooling

Improve cooling. Let
the device cool down.
To reset the error
message, switch off
the line voltage for at
least 25 s and then
switch it on again.
Alternatively, reset
the error message by
applying a control
signal of < 0.5 V to
Din1 or by shorting
Din1 to GND.

Ambient temperature
too high

Reduce the ambient
temperature. Let the
device cool down.
To reset the error
message, switch off
the line voltage for at
least 25 s and then
switch it on again.
Alternatively, reset
the error message by
applying a control
signal of < 0.5 V to
Din1 or by shorting
Din1 to GND.

Impermissible point of
operation (e.g. back
pressure too high)

Correct the operating
point. Let the device
cool down.
To reset the error
message, switch off
the line voltage for at
least 25 s and then
switch it on again.
Alternatively, reset
the error message by
applying a control
signal of < 0.5 V to
Din1 or by shorting
Din1 to GND.

In the event of further malfunctions, contact ebm-papst.

6.1 Vibration testing

Checking of fan for mechanical vibration based on ISO 14694.
Recommendation: Every 6 months. Max. vibration severity is 3.5 mm/
s, measured at the motor fastening diameter on the motor support plate in
the direction of the motor axis of rotation and perpendicular to this.

Item no. 55793-5-9970 · ENU · Change 94781 · Approved 2018-01-23 · Page 13 / 15

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание K3GA00-PV03-01

Страница 1: ...e permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules The safety hazards associated with the devi...

Страница 2: ...come to a standstill DANGER Ejected parts Missing protective devices may cause balancing weights or broken fan blades to be ejected and cause injuries Take appropriate safety measures WARNING Rotatin...

Страница 3: ...mbar and 1050 mbar Using the device within the permitted ambient temperature range see Chapter 3 6 Transport and storage conditions and Chapter 3 2 Nominal data Operating the device with all protectiv...

Страница 4: ...max 13 mm tightening torque 4 0 6 Nm 4 Cable diameter min 16 mm max 20 5 mm tightening torque 6 0 9 Nm 5 Tightening torque 3 5 0 5 Nm 6 Mounting holes for FlowGrid 7 Installation position shaft horiz...

Страница 5: ...n in a standardized measurement setup 3 4 Technical description Weight 178 4 kg Size 1000 mm Motor size 200 Rotor surface Painted black Electronics housing material Die cast aluminum Impeller material...

Страница 6: ...d in the support structure that can be used for transport After installation ensure that the blades on the fan impeller are not deformed or bent CAUTION Risk of cutting and crushing when removing devi...

Страница 7: ...ater ingress at the customer end of the cable can damage the device Make sure the end of the cable is connected in a dry environment Only connect the device to circuits that can be switched off with a...

Страница 8: ...LA 4 3 Connection in terminal box 4 3 1 Preparing cables for connection Only strip the cable as far as necessary ensuring that the cable gland is sealed and there is no strain on the connections For t...

Страница 9: ...M control Mode parameter set 2 PWM control Fan device address 01 Max PWM 100 Min PWM 5 Save set value to EEPROM Yes Set value requirement Analog linear Direction of action parameter set 1 Positive hea...

Страница 10: ...tact changeover contact common connection contact rating 250 VAC max 2 A AC1 min 10 mA KL2 3 NC Status relay floating status contact break for failure KL 3 1 RSA Bus connection RS485 RSA MODBUS RTU SE...

Страница 11: ...EPROM setting the integrated controller s direction of action can be selected via bus or digital input Din3 normal pin open or applied voltage 5 50 VDC inverse bridge to GND or applied voltage 1 VDC S...

Страница 12: ...ssively high vibration levels and possibly resonant frequencies must be determined in the course of fan commissioning Either run through the resonant range as quickly as possible with speed control or...

Страница 13: ...matically Device restarts automatically without warning Faulty connection Isolate from supply correct connection see connection diagram Broken motor winding Replace device Deficient cooling Improve co...

Страница 14: ...ce device 6 4 Disposal For ebm papst environmental protection and resource preservation are top priority corporate goals ebm papst operates an environmental management system which is certified in acc...

Страница 15: ...aterials and are therefore to be treated in the same manner The materials concerned are as follows Miscellaneous insulators used in the terminal box Power cables Cables for internal wiring Electrolyti...

Отзывы: