6.1 Cleaning

NOTE

Damage to the device during cleaning.

Malfunction possible
→ Do not clean the device using a water jet or high-pressure

washer.

→ Do not use any cleaners containing acids,

bases or solvents.

→ Do not use any pointed or sharp-edged objects to clean.

6.2 Safety test

NOTE

High-voltage test

The integrated EMC filter contains Y capacitors. Therefore, the

trigger current is exceeded when AC testing voltage is applied.
→ Test the device with DC voltage when you carry out the

high-voltage test required by law. The voltage to be used

corresponds to the peak value of the AC voltage required by

the standard.

What has to

be tested?

How to test?

Frequency

Which

measure?

Check the

protective

casing against

accidental

contact for

damage and to

ensure that it is

intact

Visual inspection At least every

6 months

Repair or

replacement of

the device

Check the

device for

damage to

blades and

housing

Visual inspection At least every

6 months

Replacement

of the device

Mounting the

connection lines

Visual inspection At least every

6 months

Fasten

Check the

insulation of

the wires for

damage

Visual inspection At least every

6 months

Replace wires

Impeller for

wear/deposits/

corrosion and

damage

Visual inspection At least every

6 months

Clean or

replace impeller

Tightness of

screwed cable

gland

Visual inspection At least every

6 months

Retighten,

replace if

damaged

Condensate

discharge

holes for

clogging, as

necessary

Visual inspection At least every

6 months

Open bore holes

Item no. 50647-5-9970 · ENG · Revision 82549 · Release 2014-05-08 · Page 12 / 12

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание K3G400-AQ23-01

Страница 1: ......

Страница 2: ...to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules Any safety hazards stemming from the device must be re evaluated once it is...

Страница 3: ...on the system machine wait until all parts have come to a standstill DANGER Flying parts Missing safety devices may cause balancing weights or broken fan blades to be ejected at high speeds causing bo...

Страница 4: ...ce in the following ways is particularly prohibited and may cause hazards Operating the device with an imbalance e g caused by dirt deposits or icing Operation in medical equipment with a life sustain...

Страница 5: ...ameter min 4 mm max 10 mm tightening torque 4 0 6 Nm 3 Tightening torque 3 5 0 5 Nm 4 Mounting position shaft horizontal install the support struts only vertically as shown in the view or rotor on bot...

Страница 6: ...fer to product drawing Condensate discharge holes Rotor side Operation mode S1 Motor bearing Ball bearing Technical features Output 10 VDC max 10 mA Output 20 VDC max 50 mA Output for slave 0 10 V Inp...

Страница 7: ...er be installed Install the undamaged device according to your application 4 2 Connecting the electrical system DANGER Electric voltage on the device Electric shock Always install a protective earth f...

Страница 8: ...AC 16 A 15 A C16A 1 5 16 3 PE AC 380 480 VAC 20 A 20 A C20A 2 5 14 3 PE AC 380 480 VAC 25 A 25 A C25A 4 0 12 3 PE AC 380 480 VAC 32 A 30 A C32A 6 0 10 AWG American Wire Gauge 4 2 3 Idle current Becaus...

Страница 9: ...e corresponding terminals Use a screwdriver to do so During the connection work ensure that no cables splice off Fig 2 Connecting the wires to terminals Seal the terminal box 4 3 3 Cable routing No wa...

Страница 10: ...n pin or applied voltage 5 50 VDC disabling bridge to GND or applied voltage 1 VDC reset function triggers software reset after a level change to 1 VDC SELV KL 3 8 Din2 Digital input 2 parameter set s...

Страница 11: ...fan for foreign objects and remove any that are found Apply the nominal voltage to the voltage supply Start the device by changing the input signal 4 8 Switching off the device Switching off the devi...

Страница 12: ...Switch off de energise and remove mechanical blockage Mains supply voltage faulty Check mains supply voltage restore power supply Important The error message resets automatically The device starts up...

Страница 13: ...nst accidental contact for damage and to ensure that it is intact Visual inspection At least every 6 months Repair or replacement of the device Check the device for damage to blades and housing Visual...

Отзывы: