
Page | 3
This document is proprietary. No disclosure, reproduction or use of any part thereof may be made without the expressed
written permission of Ebbco Inc. or its subsidiaries.
Table of Contents:
Section 1
Introduction
1.1 Introduction
1.2 Sequence of Operation
Section 2
System Specifications
2.1 System Utilities Requirements
2.2 System Components
Section 3
Installation and Start-Up Procedures
3.1 Site Requirements
3.2 Installation Procedure
3.3 Heat Exchanger Installation Procedure
3.4 Chiller Installation Procedure
3.5 Start-Up Procedure
Section 4
System Maintenance
4.1 CLS Daily Check List
4.2 Pump Maintenance
4.3 Pre-Filter Bag Maintenance
4.4 Bag Vessel Maintenance
4.5 Hurricane Vessel Maintenance
4.6 D.I. Vessel Maintenance
4.7 Final Filter Vessel Maintenance
4.8 Service Beacon Maintenance
4.9 Ozone Generator Maintenance
4.10 Reservoir Maintenance
4.11 Settling Weir Maintenance
4.12 Chiller Maintenance
Section 5
System Troubleshooting
5.1 System Troubleshooting
5.2 Ozone Troubleshooting
5.3 System Pump Troubleshooting
5.4 Feed Pump Troubleshooting
5.5 Chiller Troubleshooting
Section 6
Spare Parts List
6.1 Replacement Spares Parts
6.2 Recommended Spare Parts
6.3 Consumables
Section 7
General Policy & Warranty
Section 8
Product Literature & System Drawings
8.1 Bag Vessel
8.2 Hurricane Vessel
8.3 D.I. Vessel
8.4 Final Filter Vessel
8.5 TDS Meter
8.6 Flow Schematic
8.7 Electrical Schematic
8.8 Acceptance Forms