Ebbco CLS-141-24K H.E.-SWS Скачать руководство пользователя страница 19

Page | 19 

This document is proprietary. No disclosure, reproduction or use of any part thereof may be made without the expressed 

written permission of Ebbco Inc. or its subsidiaries. 

Section 5: 

Troubleshooting Guide 

Warning

:

 

Always disconnect power and relieve pressure from the system before performing 

any maintenance on this Filtration System 

Caution:

 

Always follow correct lock out procedures when working on this Filtration System 

5.2 Ozone Troubleshooting 

There are five areas to check to determine the location of any problem: 

1) Ensure all cords between ozone generator and dispersion stone are kink free.
2) Ensure all cords are undamaged.
3) Ensure ozone generator is turned on.
4) Ensure electrical connection is functioning properly.
5) Ensure there is a presence of ozone bubbles inside of the clean tank.

5.3 System Pump Troubleshooting 

Problem 

Cause 

Remedy 

Failure to Pump 

Pump not properly primed 

Make sure pump casing and 
suction line are full of water 

Reduced capacity 

and/or head 

Air pockets or leaks in suction line 

Check suction piping 

Clogged impeller 

Remove and clean 

Pump loses prime 

Air leaks in suction line 

Check suction piping 

Excessive suction lift and operating 
too near shut-off point 

Move pump nearer to water level 

Water level drops while pumping, 
uncovering suction piping 

Check water supply and add 
length of pipe to suction to keep 
submerged end under water 

Mechanical 

troubles and 

noises 

Bent shaft and/or damaged bearing 

Take motor to authorized motor 
repair shop 

Suctions and/or discharge piping not 
properly supported and anchored 

See that all piping is supported to 
relieve strain on pump assembly 

Содержание CLS-141-24K H.E.-SWS

Страница 1: ...RIAL FILTRATION SYSTEMS CUSTOMER MODEL CLS 141 24K H E SWS OPERATION AND MAINTENANCE MANUAL EBBCO INC 51536 Industrial Drive New Baltimore Michigan 48047 Phone 800 991 4225 www ahbinc com E M P L O Y...

Страница 2: ...HB ALCOA MANUFACTURER 51536 INDUSTRIAL DRIVE NEW BALTIMORE MICHIGAN 48047 USA TEL 800 991 4225 MODEL CLS 141 24K H E SWS OPERATION AND MAINTENANCE MANUAL IMPORTANT Failure to install Ebbco Inc brand F...

Страница 3: ...ance 4 3 Pre Filter Bag Maintenance 4 4 Bag Vessel Maintenance 4 5 Hurricane Vessel Maintenance 4 6 D I Vessel Maintenance 4 7 Final Filter Vessel Maintenance 4 8 Service Beacon Maintenance 4 9 Ozone...

Страница 4: ...evel assembly inside of the dirty tank will open a valve and supply make up water if the catch tank overflow supply is insufficient From the dirty tank water is pumped via the system pump through the...

Страница 5: ...I Vessel 3 Emergency Overflow Work Tank Overflow System Inlet Feed Pump TDS Meter Ozone Generator Final Filter Vessel 4 x2_ System Pump City Water Make Up Connection Figure 1 1 Filtration System Assem...

Страница 6: ...ssel 1 SLBV 0833 BC Construction 304 Passivated Stainless Steel Bag Requirement This unit accepts one 1 Filter Bag extra fine extended area Pre Filter Rim Gasket Buna nitrile Media Requirement CLS 1 G...

Страница 7: ...r s machine tool Motor 460vac 3 60Hz Horsepower 1 15 HP Speed 3300 R P M Enclosure T E F C Full Load Amp 2 5 Amps Impeller multistage Electrical Panel Custom enclosure that controls both the Garnet Re...

Страница 8: ...sure 65 PSI 4 4 bar Reading Service Filter Set Point 10 PSI Reading Pickup Inlet Header of Hurricane Vessel Service Beacon Dry contact Bulb 5w Enclosure IP54 UL Type 12 Triggered by TDS meter Set Poin...

Страница 9: ...lectrician connect the dedicated electrical power supply to the CLS electrical panel per the enclosed electrical drawing E 2214 071 001 4 If a settling weir is equipped use the provided hose to connec...

Страница 10: ...g cooling device inlet 3 4 Chiller Installation Procedure To install a 90K in line chiller unit 1 Remove the hose from the chiller inlet and outlet hose barbs on the CLS see right and below right imag...

Страница 11: ...en synchronized at the factory but if they are running in reverse have a qualified industrial electrician swap over one of the incoming power lines at the electrical panel 4 Carefully open the bleeder...

Страница 12: ...rricane filter cartridge typically will not get a large pressure differential This filter should be changed on a routine maintenance schedule Ebbco Inc recommends changing the cartridge on the 1st of...

Страница 13: ...g the bleeder valve located on top of the vessel lid 3 Open the drain valve located near the bottom of the vessel red valve Wait until the pressure gauge reads 0 PSI prior to removing the lid Note Do...

Страница 14: ...ct with cartridge and the retaining nut 9 Place the top disc on the replacement filter cartridge while the assembly is still outside of the vessel Reapply the retainer nut and properly tighten so the...

Страница 15: ...valve to release any trapped air inside of the vessel close the bleeder valve once all the air is purged and fluid starts to flow out of the valve Fluid should now flow through the D I vessel whenever...

Страница 16: ...e may clog up with mineral deposits after prolonged use This will reduce the amount of ozone flow through the stone The stone will start to appear a darker color as it begins to clog To clean the disp...

Страница 17: ...The inlet 90 PVC pipe should be facing downwards and the outlet 90 PVC pipe should be facing upwards Note When installing a new settling weir bag the side that has the black inlet lettering printed o...

Страница 18: ...reen inside the dirty tank is not plugged The screen should be free of debris for best performance 3 Check the electrical hookup for proper direction and power requirements In most cases the pump moto...

Страница 19: ...nctioning properly 5 Ensure there is a presence of ozone bubbles inside of the clean tank 5 3 System Pump Troubleshooting Problem Cause Remedy Failure to Pump Pump not properly primed Make sure pump c...

Страница 20: ...r does not start no motor noise At least two of the power supply leads have failed Check fuses terminals and supply leads Motor does not start humming noise One of the supply leads has failed See abov...

Страница 21: ...itten permission of Ebbco Inc or its subsidiaries Section 5 Troubleshooting Guide WARNING Always disconnect power and relieve pressure from the system before performing any maintenance on this Filtrat...

Страница 22: ...2 5 days High Pressure Final Filter Vessel Seal Kit 4 CLS 801 ORL 1 2 5 days Settling Wier Bag WJF SWB 1 2 5 days Service Beacon light bulb CLS SL 130 3 2 5 days 0 60 PSI Pressure Gauge WJF GA 0 60 2...

Страница 23: ...are subject to normal wear It is recommended that you keep a spare vessel seal kit and pump seal in stock at all times This limited warranty does not cover any products damages or injuries resulting...

Отзывы: