3.1
Always check to make sure pump was not damaged in shipment before accepting delivery. If
damage is evident, a claim should be filed with the carrier at that time.
3.2
Always check the pump label against the requirement to make sure you are installing the proper
pump specified for the job.
3.3
Make sure that the pump suction, marked by a sticker, is connected to the liquid source and
that the discharge, similarly marked, is connected to the discharge line.
3.4
Make sure that the pump base is firmly secured to a solid flat surface and that the suction and
discharge lines are aligned and properly supported to prevent pipe strain on the pump.
3.5
Ensure that the suction and discharge gaskets are properly installed to prevent leaks and that
they do not restrict the flow to or from the pump.
Standard ANSI mating flanges should be used to connect the pump to the piping. Suction and
discharge piping should be no smaller than the respective pump port sizes.
3.6
Isolation valves should be installed on both the suction and discharge side of the pump in the
event service of the pump is required.
3.7
Provide adequate space and ventilation around the pump for service and motor cooling.
3.8
If the installation of the motor is necessary, refer to section 5 for instructions.
Ebara Stainless Steel Vertical Multistage
EVMU
Instructions and Operation
Ebara
Fluid Handling
www.pumpsebara.com
6
(t) 803 327-5005 • (f) 803 327-5097
rev. 11/10
On three phase motor installations, always check for proper motor rotation prior to starting by
jogging the motor. Shaft rotation must turn clockwise when viewed from the top of the motor.
Make sure the motor is correctly wired, refer to instructions on motor name plate.
Section 3 – Pump Checks and Installation
CaUTION
!!
Use standard plumbing practices to ensure unnecessary line losses, cavitation and
prevent air lock.
WarNING
!!