Replacing the water outlet pipe with UVC lamp
19
10 Replacing the water outlet pipe with UVC lamp
For installation and removal see chapter 9.
11 Renewing the water bath
Close the water stop cock.
Depressurise the water pipe by pressing the button for still water.
Turn off the water dispenser.
Pull out the mains plug.
Hold the level indicator hose (1) in a bucket.
Completely empty the water bath.
Position the level indicator hose (1) upright and use a cable tie to
fix in place.
Insert the water
connection hose into the “FILL THE ICE-BANK”
connection.
Open the water stop cock.
Fill the water bath to a level between MIN and MAX.
Close the water stop cock.
Insert the water connection hose into the “IN H
2
O” connection.
Before inserting the hoses, spray the end of the hose with
EAUVATION N° 2.
Unscrew the upper cover plate and remove it.
Using curved needle-nose pliers, add one tablet to prevent the
formation of algae to the water bath.
Screw the upper panel tight.
Plug in the mains plug.
Содержание Acqua 80
Страница 1: ...Service Instructions Acqua 80 Water Dispenser ...
Страница 2: ......
Страница 28: ...Flow schema 26 18 Flow schema ...
Страница 29: ......