Commissioning
9
5
Commissioning
IMPORTANT
The hygiene filter may be installed only after the hygiene maintenance (
6) to avoid de-
stroying it.
Caution
Damage as the result of leaking water
Adhere to the following sequential order during commissioning:
Fill the water bath of the ice-bank (
Install the dummy plug (
5.1 Prerequisites
Gas and water connection in accordance with chapter 4.
Electrical connection in accordance with chapter 4.
The water stop cock is closed.
The valve on the carbonic acid bottle is closed.
The shut-off valve after the gas pressure reducer is closed.
The water dispenser is switched off.
5.2 Fill the ice-bank water bath
Open the water stop cock.
Fill the water bath to a level between MIN and MAX.
Use a cable tie to fix the level indicator hose in place.
Close the water stop cock.
Insert the water connection hose into the “IN H
2
O” connection.
Before inserting the hose, spray the end of the hose with
EAUVATION N° 2.
5.3 Installing the dummy plug
Pull out the mains plug.
Unscrew the upper cover plate and remove it.
Remove the bracket (1).
Spray the inside of the filter head (3) with EAUVATION N° 2.
Spray the dummy plug (4) with EAUVATION N° 2 and screw
into the filter head (3).
Close the lever at the filter head (turn to the right).
Install the bracket (1).
Содержание Acqua 80
Страница 1: ...Service Instructions Acqua 80 Water Dispenser ...
Страница 2: ......
Страница 28: ...Flow schema 26 18 Flow schema ...
Страница 29: ......