background image

12

Instruction Manual

Effective March 2020

  

  

  

EATON

 www.eaton.com

2.2.2  Cable treatment

• 

Cable treatment on finished products

• 

Please pay attention to the protection of the cable when using

Screw nut 

base

Sealing 

ring

washer

Rubber 

gasket

washer

Flat 

gasket

Flame proof 

seal fitting

HPS89-01 

Epoxy resin

Bakelite 

gasket

Lead-out 

cable 

Filling with A.B type cable sealing filler

Compression 

nut

2.3  Usage

2.3.1  System connection

Figure 2.3.1.1 Connection diagram of the system

Digital video signal is transmitted by wired or wireless IP networks. The video can be monitored and recorded at any time, no matter in 

LAN or WAN, such as internet.

2.3.2  Cable indication

A composite cable was equipped with finished product of YHPTZ41, it leads out from the side of the base-frame and its length is over 2 

meters. The user shall lead the composite cable into the junction box and connected the system bus before service. 

Table 2.3.2.1  Cable indication

Composite cable

Product

Power cable

UTP5E

Function

Live wire

Zero line

Earth line

Data transmission

Color

brown

Grey

Yellow

/green

Orange 

white

orange

green 

white

blue

blue 

white

green

brown 

white

brown

Содержание YHPTZ41 Series

Страница 1: ...grated Camera Set IP Code IP 68 1 2m 45min Ex Marking II2G Ex db op is IIC T6 Gb for type YHPTZ41 or Ex db IIC T6 Gb for type YPTZ41 1 II2D Ex tb IIIC T80 C Db Ex tb op pr IIIC T95 C Db optical fiber...

Страница 2: ...ssion of Cooper Yuhua Cooper Yuhua remains the right to modify the content and technical specifications of the product in this Instruction Manual without any form of notification in order to provide t...

Страница 3: ...per operation that against the Instruction Manual Damage caused by unauthorized disassembly Thunder or other force majeure natural disasters If any other contracts between clients and us exist we will...

Страница 4: ...midity specified in Chapter 1 6 To be sure the power supply comply with the requirement indicated in the nameplate The internal and external grounding shall be reliable Ensure the installation is firm...

Страница 5: ...rd atmospheric pressure 9 2 0 Installation debugging 10 2 1 Cautions 10 2 2 Assembly 11 2 3 Usage 12 2 4 Support preparation before installation of YHPTZ41 14 2 5 Installation and fastening 15 2 6 Pro...

Страница 6: ...Avoid damage caused by compressing or violent vibration in transmission storage or operation The product shall be well packaged as new product or equivalent in transmission We suggest using this produ...

Страница 7: ...an 80 C in normal operation Toughed glass is adopted in observation port it has passed the impact and thermal shock test IP68 1 2m 45min Stuffing box type cable entries are adopted in this product the...

Страница 8: ...rt 28 Protection of equipment and transmission systems using optical radiation It is used in the places where is classified as Zone 1 and Zone 2 contained Group IIA Group IIB and Group IIC gases tempe...

Страница 9: ...cal data Material stainless steel 304 or 316L Horizontal rotating range CC 0 360 continues Vertical rotating range 90 90 Horizontal rotating speed 0 1 40 S Smooth variable speed rotation Vertical rota...

Страница 10: ...shade 2pcs Certificate of conformity Qualification certificate and Instruction Manual Cross recess oval head screws M5X8 4pcs Hexagon bolts M8X30 6pcs Brass screws 1 4 X6 1pc Brass screws 1 4 X12 1pc...

Страница 11: ...lease follow the Instruction b The power must comply with requirements specified in 5 c Please use this product in conditions atmosphere pressure temperature and humidity specified in chapter 1 6 d Si...

Страница 12: ...em Digital video signal is transmitted by wired or wireless IP networks The video can be monitored and recorded at any time no matter in LAN or WAN such as internet 2 3 2 Cable indication A composite...

Страница 13: ...ch SW1 Protocol setting PELCO P PELCO D VICON protocols can be used PELCO P and PELCO D protocol can be set directly by SW1 For VICON protocol the following instructions shall be followed turn on the...

Страница 14: ...examination before service Check if the power supply AB control cable and video cable are well connected and if the settings on the switch are correct 2 3 6 Service status and inspection in service YH...

Страница 15: ...n the basis of values specified in tables 2 of EN IEC 60079 1 2 7 Grounding Internal and external grounding shall be well connected and reliable 2 8 Reserved cable The length of cable reserved on fini...

Страница 16: ...can be delivered in all modes of transportation but without direct rain or snow 4 2 Storage condition duration and cautions This product can be stored for one year in environment of temperature range...

Страница 17: ...us harmful substances or elements in the component homogeneous material is lower than the limit specified in the standard 2 Symbol means the content of the poisonous harmful substances or elements in...

Страница 18: ...t warrant a specific layout or functionality Their use in whatever form is subject to prior approval by Eaton The same applies to Trademarks especially Eaton Moeller and Cutler Hammer The Terms and Co...

Отзывы: