A) Bushing insulators

Low voltage (LV) DIN 42530

1. Fixing of bushing terminal stud:

                                     cork gasket

                                          nbr gasket

2. Connection between nuts

3. Fixing of flag connector to 

terminal stud (bolt and nut in 

stainless steel)

4. Bolts to flag connector surface

High Voltage (HV) DIN 42531

1. Fixing of top of terminal stud 

   (terminal stud and nuts in brass)

2. Connection to terminal stud 

   (terminal stud and nuts in brass)

3. Fixing of base

    (stud and nut in stainless steel)

                                                

cork gasket

                                   nbr gasket

Plug-in bushing

                                           cork gasket     

                                           nbr gasket

B) LV connecting busbar

I

nterconnection

(pin and nut in 8.8 steel)

C) Cover / frame

Bolt and nut in stainless  steel 

(pitch = 60mm) = cork 

gasket (pitch = 90mm) = nbr  gasket

D) Busbar bushings

Fixing on cover

Top piece onto bottom piece

5,4-6Nm

20-25Nm

20-25Nm

8-15Nm

25-35Nm

25-35Nm

10-20Nm

10-15Nm

10-20Nm

10-15Nm

45-60Nm

250A

10-15Nm

7-10Nm

15-20Nm

40-60Nm

40-60Nm

10-15Nm

15-20Nm

20-35Nm

15-25Nm

65-85Nm

40-60Nm

40-60Nm

100-150Nm

95-130Nm

630A

25-55Nm

17-37Nm

70-100Nm

1000A

65-150Nm

44-100Nm

250-350Nm

2000A

100-300Nm

67-200Nm

3150A

150-500Nm

100-334Nm

Table 1:

 Torque values of connection of live conductors

•  Be sure that the cable and busbar terminal connections are not loose. Loose connections may  
    cause extra temperature rise and voltage drop. 
•  All connections have to be done according to Table 1.

Ulusoy Distribution Transformers Maintenance, Operation, Installation and Instruction Manual 

Содержание Ulusoy

Страница 1: ...Ulusoy Distribution Transformers Maintenance Operation Installation and Instruction Manual www eaton com...

Страница 2: ...ary assistance to the maintenance personnel to facilitate a periodic inspection of the transformer and to indicate the steps that they should follow to effect a more detailed examination of the active...

Страница 3: ...n imminently hazardous situation which if not avoided will result in death serious personnel injury and property damage WARNING indicates a potentially hazardous situation which if not avoided could r...

Страница 4: ...an be used to lift the entire equipment Under no circumstances may moisture be allowed to penetrate into the transformer For hermetically sealed transformers both those with gas cushions and those wit...

Страница 5: ...HV or low voltage LV insulators to guide the transformer when moving it During the transport or the handling it is recommended to use only the special lifting eyes and tow attachments Angle between t...

Страница 6: ...of individual pieces WARNING Unless indicated otherwise storage temperature must be between 25C and 50C Monitoring and checking the transformers during storage Preferably only fully assembled liquid f...

Страница 7: ...nical Connections Decide and choose the cable cross section according to the system current and voltage Be sure that the surfaces are clean Dirty surfaces may cause isolation and contact problems 6 IN...

Страница 8: ...and nut in 8 8 steel C Cover frame Bolt and nut in stainless steel pitch 60mm cork gasket pitch 90mm nbr gasket D Busbar bushings Fixing on cover Top piece onto bottom piece 5 4 6Nm 20 25Nm 20 25Nm 8...

Страница 9: ...2 Table 2 Outdoor Electrical Clearance Un H V side voltage of rated level All clearances are in mm Electrical clearances are given for 1000m After 1000m till 3000m each 100m distance must be increase...

Страница 10: ...pecifications should be added Oil leakage must be prevented with proper procedure If transformer is hermetically sealed the manufacturer should be informed as soon as possible Dehydrating breather sho...

Страница 11: ...3 5 Years Conservation Tank Oil Leakage Every 2 Years Annually Oil Oil Dielectric Test All periodical controls are listed as a table below Table 3 Periodical Check Pressure relief device T 10 must ne...

Страница 12: ...w Oil Sample Desired Value New Oil Filling Transformer Oil Sample Desired Value Oil Sample From Operating Transformer Proper Must Be Removed Pcb Analysis ASTM D 4059 ppm NA NA 50 50 Test Name Method U...

Страница 13: ...sformers Current transformer Winding temperature indicator With and without contact thermometer 8 ACCESSORIES 8 1 STANDARD COMPONENTS AND ACCESSORIES Rating plate HV porcelain bushing LV porcelain bus...

Страница 14: ...sampling of gases and of oil from oil filled electrical equipment and for the analysis of free and dissolved gases IEC 60599 Mineral oil impregnated electrical equipment in service Guide to the inter...

Страница 15: ...about the surface protection quality paint of the transformer 7 Is there any oil leakage on the transformer Invalid for dry type distribution transformers 8 Is there any conspicuous point at which you...

Страница 16: ...90 312 502 06 63 Eaton s mission is to improve the quality of life and the environment through the use of power management technologies and services We provide sustainable solutions that help our cust...

Отзывы: