Introduction of Switchgear
1
Switchgear Type Label
2
Switchgear Details
3
Switchgear Process Order /
Flowchart
4
Spring Charging Operating Hole
5
Earthing Switch Operating Hole
6
On / Off Buttons
7
Internal Lighting Buttons
8
Padlock Housing
1
Load Break Switch (LBS)
2
MV Cable Terminals
3
Capacitive Voltage Divider
4
MV Cable Clamps
5
Earthing Bar
7
4
1
3
6
5
8
Single line scheme
View of cable connection terminal
2
4
5
1
2
3
Ulusoy HMH24-01 Incoming-Outgoing Switchgear with LBS User Manual
August 2020 www.eaton.com
3
24-01ING
�
0
00
II
ANKARA
TEL: +90 312 267 07 12 FAX: +90 312 267 05 17
www
ULUSOY
Standard: IEC 62271-200
0
I
0
I
CLOSE
THE SWITCHGEAR’S
DOOR
OPEN
THE EARTHING
SWITCH
ASSEMBLE
THE COIL SPRING
LOAD BREAK
SWITCHGEAR
CLOSE
LOAD BREAK
SWITCHGEAR
OPEN
IS THERE ANY
OPERATION ON
THE SWITCHGEAR?
CLOSE
THE EARTHING
SWITCH
OPEN
THE SWITCHGEAR’S
DOOR
OPERATIONNAL
DIAGRAM
YES
NO
IF THIS SWITCHGEAR IS USED AS AN
INCOMING FEEDER DO NOT CLOSE
THE EARTING SWITCH BEFORE CUTTING
DOWN THE ENERGY FROM PREVIOUS STATION
!
DO NOT INTERFERE WITH THE EARTHING
MECHANISM WHILE THE LOAD BREAKER
SPRING IS CHARGED
!