11
4.1 Access to terminal blocks (AC source to UPS)
High leakage current:
Earth connection essential before connecting supply.
Common input/output sources connection
This type of connection must be carried out by qualified electrical personnel
Before carrying out any connection, check that the upstream protection devices
(Normal AC source and Bypass AC source) are open "O" (Off).
Always connect the ground wire first
1. Remove the cover of terminal block.
2. Connect the AC cable to terminal blocks refer to the indication on rear panel
Tower model:
3. Tie up the AC cable to the rear panel.
4. Install back the cover of terminal block.
Содержание Tower 6KS
Страница 1: ...Eaton 9E IN User Manual Tower 6 10K...
Страница 9: ...3 2 Presentation 2 1 Front panel Tower model Tower UPS 6KS 10KS Tower UPS 6K 10K Tower EBM...
Страница 11: ...5 2 3 Circuit diagram...
Страница 34: ...28...
Страница 36: ...30...
Страница 37: ...31 Example set rated output voltage value...