5.4 RTC-100 Replacement

 warning

high voltages are present in and around transfer switCh 

equipment.  before attempting to replaCe any Component, 

disConneCt the line power from the equipment being serviCed 

by opening and loCKing out, if possible, the neXt highest 

disConneCt deviCe.  failure to follow this proCedure Could 

Cause severe personal inJury and/or death. 

 

always turn the utility power off and turn the generator 

Control seleCtor switCh to the “off” position before 

attempting to replaCe any Components.

Step 1:

 Turn the Generator Start select to “OFF” before attempt-

ing to replace the RTC-100 controller.  Ensure all sources of 

power are removed.

Step 2:

 Disconnect the J1, J2, J3, J4, J5, J6, J7, and J9 plugs from 

the controller

Step 3:

 Disconnect the customer wires connected to J7, J8, and J9.

Step 4:

 Remove the four (4) screws located at the corners of the 

controller that secure it to the power panel.  Remove the 

controller. (The center support will have to be removed also.)

Step 5:

 Align the new controller with the mounting holes.  Secure 

the new controller board using the existing hardware.  

Tighten the screws.

Step 6:

 Connect the J1, J2, J3, J4, J5, J6, J7, and J9 plugs to their 

original receptacles.

Step 7:

 Reconnect the customer wires to J7, J8, and J9.

Step 8:

 Reapply power to the transfer switch.

Step 9:

 Place the generator control selector switch in the “AUTO” 

position after the controller has been replaced.  (The 

Generator may start but will shut down within 5 minutes.)  

Test the system for proper functionality.

Section 5: Maintenance, troubleshooting, 
and replacement

5.1 Maintenance and Care

The RTC-100 is designed to be a self-contained and maintenance-

free unit.  The printed circuit board is conformally coated at the fac-

tory.  The RTC-100 is intended for service by factory-trained person-

nel only.

5.2 RTC-100 Controller Troubleshooting

The Troubleshooting Guide (Table 3) is intended for service personnel 

to identify whether a problem being observed is external or internal 

to the unit.  For assistance with this determination, contact Eaton 

Electrical.  If a problem is identified to be internal, the unit should be 

returned to the factory for replacement.

Table 3.  Troubleshooting Guide.

symptom

probable Cause

possible solution(s)

“Util Avail” and “Gen Avail” 

LEDs are not lit.

Power is deficient or absent.

Verify that power is con-

nected at J1 – J4 and that it 

is within specifications.

.

RTC-100 is malfunctioning

Replace the unit.

Utility source or Generator 

source is not available when 

it should be.

Voltage is not within  

setpoint values.

Verify voltage with  

multimeter.  Check the  

programmed setpoint values.

5.3 Level of Repair

This manual is written with the assumption that only ATS trouble-

shooting will be performed.  If the cause of malfunction is traced 

to an RTC-100, the unit should be replaced with a new unit.  The 

malfunctioning unit should then be returned to Eaton Electrical for 

factory repairs.

Содержание RTC-100

Страница 1: ...cription 5 3 Operation 6 4 Programming 7 5 Maintenance Troubleshooting and Replacement 18 Description Page Effective December 2009 Instruction Booklet IB 70 8698 Instruction Manual for the Eaton RTC 1...

Страница 2: ...nce of this device warning THE WARNINGS AND CAUTIONS INCLUDED AS PART OF THE PROCEDURAL STEPS IN THIS DOCUMENT ARE FOR PERSONNEL SAFETY AND PROTECTION OF EQUIPMENT FROM DAMAGE AN EXAMPLE OF A TYPICAL...

Страница 3: ...of loads to ensure that overloading of the genera tor does not occur Provide start signals for all makes and models of generators Utility sensing 2 wire start etc 1 4 Glossary With respect to their u...

Страница 4: ...provides a time delay that prevents a connected Generator source from being declared failed in order to override momentary generator fluctuations If the Generator remains in the failed state then aft...

Страница 5: ...rt schemes Connector J8 contains 2 contacts for the active load con trol portion of the controller These contacts are discussed in section 4 1 4 J9 provides connection for the control input and the tr...

Страница 6: ...tomatically initiate an immediate transfer of power when the power fails or the voltage level drops below a preset value and an alternate source of power is available 3 2 Operating Voltage and Measure...

Страница 7: ...gramed The 50 second setting may be used to allow for a longer warm up period of the Generator The FREQ jumper enables the end user to program the RTC 100 for an operating frequency of either 50 or 60...

Страница 8: ...d to the generator To perform a manual test the GEN TEST push button See Figure 3 needs to be momentarily NO LONGER THAN 2 SECONDS pressed and released The TDES Time Delay Engine Start timer will star...

Страница 9: ...for the Eaton RTC 100 AutomaticTransfer Switch Controller eaton corporation www eaton com Effective December 2009 Figure 3 Generator Test Plant Exercise Jumpers and Generator Test Pushbutton Jumpers s...

Страница 10: ...fer from utility to generator or from generator to utility does NOT occur when it should the CONNECTED LED s WHITE or YELLOW depending on which source should be connected will flash see Figure 4 Once...

Страница 11: ...ad see Figure 5 The primary load has priority over the secondary load The loads can be any load that provides a voltage to turn on i e Air Conditioner hot tub etc The relays will function with a volta...

Страница 12: ...RTC 100 AutomaticTransfer Switch Controller eaton corporation www eaton com Effective December 2009 Figure 6 Typical Connections of Controlled Loads Non Thermostatically Controlled Note that the Grou...

Страница 13: ...on RTC 100 AutomaticTransfer Switch Controller eaton corporation www eaton com Effective December 2009 Figure 7 Typical Connections of Controlled Loads Thermostatically Controlled Note that the Ground...

Страница 14: ...to function properly It the STARTING watts are not know then enter the RUNNING watts as the both the RUNNING and STARTING watts on the potentiom eters The RTC 100 utilizes this information to determi...

Страница 15: ...h starting KW available from the generator the load will not be allowed to energize Both the starting and running KW setting must be met before the load will be allowed to be started If the load on co...

Страница 16: ...he Load Is the Generator powering the Load Y N Are controlled load energize signal s present Y N Is this the first measurement with Load on Is this the first measurement with Load on Y Is Current kW 8...

Страница 17: ...or Max Current kW Y Close relay 1 if called for N Shed Load N Is Active Load Control RLC 100 enabled Is Active Load Control RLC 100 enabled Y Measure Load kW Measure Load kW A A C C Is load kW 90 of R...

Страница 18: ...to the transfer switch Step 9 Place the generator control selector switch in the AUTO position after the controller has been replaced The Generator may start but will shut down within 5 minutes Test...

Страница 19: ...19 Instruction Booklet IB 70 8698 Instruction Manual for the Eaton RTC 100 AutomaticTransfer Switch Controller eaton corporation www eaton com Effective December 2009 Notes...

Страница 20: ...arties This literature is not intended to and does not enlarge or add to any such contract The sole source governing the rights and remedies of any purchaser of this equipment is the contract between...

Отзывы: