4.1.4.3 Operation

While the ATS is connected to the Utility (Primary) source, the J8 

contacts on the RTC-100 will close and monitor the loads that are 

being controlled.  The starting KW that is measured when those 

loads are initiated is kept in memory on the controller.  Each time 

each of those loads is initiated, that starting KW is recorded and 

the oldest starting KW that was in memory is now removed.  When 

the controller is first energized, these memory locations are empty.  

The very first time a load is recorded, that value will populate the 4 

memory locations for that load.  This allows the RTC-100 to maintain 

a running average of the power required to start the 2 controlled 

loads that are connected to J8.  This method allows for the controller 

to track the load throughout its life time and to actively adjust as the 

load power requirements change due to age, use, etc.  This ensures 

that the loads are never applied to the generator if the generator 

does not have enough usable KW to start/run these loads.  
During a power outage, the generator is initiated and the customer 

load is connected to the generator power.  The contacts on J8 are 

held in the OPEN position for the first 10 minutes that the load is 

connected to the generator.  This allows the generator to stabilize.  

After the 10 minutes is over, the contacts will then begin to monitor 

if the controllable load is being called for.  If it is, the controller will 

verify how much KW is currently available from the generator and 

compare that to the amount of KW that is programmed into the 4 

potentiometers discussed above.  If the amount of KW is less than 

the amount of KW available from the generator, the RTC-100 will 

now close the contact and allow the controlled load to be energized.  

In the event that the controlled load is an inductive load (i.e. Air con-

ditioner, pool pump, etc) both the starting KW and running KW will 

be monitored and compared prior to energizing that load.  If there is 

enough running KW but NOT enough starting KW available from the 

generator, the load will not be allowed to energize.  Both the starting 

and running KW setting must be met before the load will be allowed 

to be started.  
If the load on contacts 3 and 4 of J8 are initialized and the load on 

contacts 1 and 2 of J8 are being called to start, and the KW is not 

sufficient to start the priority load, the secondary load will be turned 

OFF in order to allow the primary load to start.  After the primary 

load is started, the secondary load will be restarted, if enough KW 

is available, after 10 minutes.  If there is not enough KW to start the 

primary load, the secondary load will be restarted after 10 minutes 

and the controller will monitor the KW and attempt to restart the pri-

mary load once it senses the KW has changed.
Anytime a transfer occurs to generator with both sources available 

(i.e. load test, utility load shed input, etc.), the loads will be turned 

off prior to the transfer to decrease the amount of inrush current 

placed on the generator during initial loading.  The controlled loads 

will then be restarted after a 10 minute delay and verification of KW 

availability. Anytime there is a transfer from generator to utility, the 

controlled loads will remain ON during the transfer. 
At anytime while connected to the generator source and the con-

trolled loads are energized, if the running KW of the generator is 

reached or surpassed, the controlled loads will be immediately 

turned OFF to ensure that the generator has enough KW to supply 

the uncontrolled loads.  After a 10 minute delay, the RTC-100 will 

begin to monitor the J8 contacts to check if it can apply the con-

trolled loads once again.  This same scenario will occur if the voltage 

output of the generator drops below 80% of nominal will the con-

trolled loads are connected.  This is done to protect the uncontrolled 

loads from low voltage and also to prevent the generator from shut-

ting down due to under voltage or under frequency. 
If, for any reason, a controlled load is changed or replaced, the 

RTC-100 memory for the loads may need to be reset (as the power 

requirements may differ).  This can be done by pressing and hold-

ing the reset button for 5 seconds.  If this is not accomplished, the 

memory can also easily be changed by energizing the load at least 4 

times while the controllable load is connected to the utility source.

Содержание RTC-100

Страница 1: ...cription 5 3 Operation 6 4 Programming 7 5 Maintenance Troubleshooting and Replacement 18 Description Page Effective December 2009 Instruction Booklet IB 70 8698 Instruction Manual for the Eaton RTC 1...

Страница 2: ...nce of this device warning THE WARNINGS AND CAUTIONS INCLUDED AS PART OF THE PROCEDURAL STEPS IN THIS DOCUMENT ARE FOR PERSONNEL SAFETY AND PROTECTION OF EQUIPMENT FROM DAMAGE AN EXAMPLE OF A TYPICAL...

Страница 3: ...of loads to ensure that overloading of the genera tor does not occur Provide start signals for all makes and models of generators Utility sensing 2 wire start etc 1 4 Glossary With respect to their u...

Страница 4: ...provides a time delay that prevents a connected Generator source from being declared failed in order to override momentary generator fluctuations If the Generator remains in the failed state then aft...

Страница 5: ...rt schemes Connector J8 contains 2 contacts for the active load con trol portion of the controller These contacts are discussed in section 4 1 4 J9 provides connection for the control input and the tr...

Страница 6: ...tomatically initiate an immediate transfer of power when the power fails or the voltage level drops below a preset value and an alternate source of power is available 3 2 Operating Voltage and Measure...

Страница 7: ...gramed The 50 second setting may be used to allow for a longer warm up period of the Generator The FREQ jumper enables the end user to program the RTC 100 for an operating frequency of either 50 or 60...

Страница 8: ...d to the generator To perform a manual test the GEN TEST push button See Figure 3 needs to be momentarily NO LONGER THAN 2 SECONDS pressed and released The TDES Time Delay Engine Start timer will star...

Страница 9: ...for the Eaton RTC 100 AutomaticTransfer Switch Controller eaton corporation www eaton com Effective December 2009 Figure 3 Generator Test Plant Exercise Jumpers and Generator Test Pushbutton Jumpers s...

Страница 10: ...fer from utility to generator or from generator to utility does NOT occur when it should the CONNECTED LED s WHITE or YELLOW depending on which source should be connected will flash see Figure 4 Once...

Страница 11: ...ad see Figure 5 The primary load has priority over the secondary load The loads can be any load that provides a voltage to turn on i e Air Conditioner hot tub etc The relays will function with a volta...

Страница 12: ...RTC 100 AutomaticTransfer Switch Controller eaton corporation www eaton com Effective December 2009 Figure 6 Typical Connections of Controlled Loads Non Thermostatically Controlled Note that the Grou...

Страница 13: ...on RTC 100 AutomaticTransfer Switch Controller eaton corporation www eaton com Effective December 2009 Figure 7 Typical Connections of Controlled Loads Thermostatically Controlled Note that the Ground...

Страница 14: ...to function properly It the STARTING watts are not know then enter the RUNNING watts as the both the RUNNING and STARTING watts on the potentiom eters The RTC 100 utilizes this information to determi...

Страница 15: ...h starting KW available from the generator the load will not be allowed to energize Both the starting and running KW setting must be met before the load will be allowed to be started If the load on co...

Страница 16: ...he Load Is the Generator powering the Load Y N Are controlled load energize signal s present Y N Is this the first measurement with Load on Is this the first measurement with Load on Y Is Current kW 8...

Страница 17: ...or Max Current kW Y Close relay 1 if called for N Shed Load N Is Active Load Control RLC 100 enabled Is Active Load Control RLC 100 enabled Y Measure Load kW Measure Load kW A A C C Is load kW 90 of R...

Страница 18: ...to the transfer switch Step 9 Place the generator control selector switch in the AUTO position after the controller has been replaced The Generator may start but will shut down within 5 minutes Test...

Страница 19: ...19 Instruction Booklet IB 70 8698 Instruction Manual for the Eaton RTC 100 AutomaticTransfer Switch Controller eaton corporation www eaton com Effective December 2009 Notes...

Страница 20: ...arties This literature is not intended to and does not enlarge or add to any such contract The sole source governing the rights and remedies of any purchaser of this equipment is the contract between...

Отзывы: