
MBM INSTALLATION
Eaton 9395 Maintenance Bypass Module Installation and Operation Manual
S
164201719 Rev 3
www.eaton.com/powerquality
4-17
TB1
TB2 (optional)
Figure 4‐13. Interface Terminal Locations
1
10
1
10
TB1
TB2
RIB Aux #2 NO
BIB Aux #2 NC
BIB Aux #2 Common
MBP Aux #2 NO
MBP Aux #2 NC
MIS Aux #2 NC
MIS Aux #2 Common
MIS Aux #2 NO
Not Used
Not Used
MBM
BIB Aux #2 NO
RIB Aux #2 NC
RIB Aux #2 Common
MBP Aux #2 Common
K3 Aux Common
K3 NC Aux
Figure 4‐14. Terminal Blocks TB1 and TB2 Connector Assignments