INSTALLING OPTIONS
Eaton 9355 Tie Cabinet (20/30 kVA) Installation Guide
S
164201630 Rev D
www.eaton.com/powerquality
20
To install the Powerware Hot Sync
®
CAN Bridge Card:
1.
Remove the UPS front door.
2.
Remove the communication wiring access plate from the UPS rear panel and
punch a hole in it using a Greenlee punch or similar device (see Figure 14).
3.
Install conduit for the communication wiring.
Communication
Wiring Access Plate
Figure 14. Communication Wiring Access