INTRODUCTION
EATON
Powerware
®
225 kVA PDU Installation and Operation Manual
S
164201629 Rev D
www.powerware.com
1−11
1.8
For More Information
Refer to the
Powerware Energy Management System (EMS) Level 3 Interface User’s
Guide
for the following additional information:
S
Branch circuit monitoring configuration instructions, including branch circuit
parameter setup and alarm setup.
S
Branch circuit monitoring operation, including using the PDU LCD and menu map.
S
Branch circuit monitoring troubleshooting, including alarms and conditions, and
service and support.
Visit www.powerware.com or contact an Eaton service representative for information
on how to obtain copies of this manual.
1.9
Getting Help
If help is needed with any of the following:
S
Scheduling initial startup
S
Regional locations and telephone numbers
S
A question about any of the information in this manual
S
A question this manual does not answer
Please call the Eaton Corporation Help Desk for Powerware products at:
United States:
1−800−843−9433
or
1−919−870−3028
Canada:
1−800−461−9166 ext 260
All other countries:
Call your local service representative
Содержание Powerware 225 kVA Three-Phase Power Distribution Unit
Страница 22: ...EATON Powerware 225 kVA PDU Installation and Operation Manual S 164201629 Rev D www powerware com 1 2 ...
Страница 40: ...EATON Powerware 225 kVA PDU Installation and Operation Manual S 164201629 Rev D www powerware com 4 6 ...
Страница 141: ......
Страница 142: ... 164201629D 164201629 D ...