Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201716—Rev 13
79
Table 25. Pull-Chain Wiring Terminations
From UPS 1
To UPS 2
To UPS 3 (If Installed)
To UPS 4 (If Installed)
TB2–1
(Pull Chain)
TB2–1
(Pull Chain)
TB2–1
(Pull Chain)
TB2–1
(Pull Chain)
TB2–2
(Pull Chain Common)
TB2–2
(Pull Chain Common)
TB2–2
(Pull Chain Common)
TB2–2
(Pull Chain Common)
Содержание Power Xpert 9395 275
Страница 1: ...p n 164201716 Revision 13 225 550 kVA Installation and Operation Manual Power Xpert 9395 550 275 UPS...
Страница 8: ......
Страница 18: ...xviii Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201716 Rev 13 List of Figures...
Страница 31: ...10 Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201716 Rev 13 Introduction...
Страница 35: ...14 Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201716 Rev 13 Safety Warnings...
Страница 133: ...112 Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201716 Rev 13 Understanding UPS Operation...
Страница 220: ...Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201716 Rev 13 199 Product Specifications...
Страница 221: ...16420171613 164201716 13...