16
Eaton PDI WaveStar Infinity 2 Monitoring System Setup and Operation Manual P-164001106—Rev 01
44..22..33
R
REEP
PO
O C
Coonnnneeccttiioonn
A customer REPO connection is usually made to a
VVIT Sensor Base Board.
(
VVIT
=Voltage-Voltage-Current-
Transformer, the sensor types on the board.) A VVIT Sensor Combo Board is typically the first Sensor Board in a
PDU Sensor Board chain (see
) and has connections typical for a PDU, such as transformer thermal
monitoring and EPO.
The REPO connection on the VVIT Board is clearly marked.
Figure 9. REPO Connection to VVIT Board
VVIT Board
The
VVIT
Board is typically the
�
irst PCB in a PDU’s sensor board
chain.
Содержание PDI WaveStar Infinity 2
Страница 1: ...p n P 164001106 Revision 01 Setup and Operation Manual Eaton PDI WaveStar Infinity 2 Monitoring System...
Страница 4: ......
Страница 10: ...x Eaton PDI WaveStar Infinity 2 Monitoring System Setup and Operation Manual P 164001106 Rev 01 List of Tables...
Страница 12: ...2 Eaton PDI WaveStar Infinity 2 Monitoring System Setup and Operation Manual P 164001106 Rev 01 Safety...
Страница 60: ...50 Eaton PDI WaveStar Infinity 2 Monitoring System Setup and Operation Manual P 164001106 Rev 01 Setup...
Страница 76: ...66 Eaton PDI WaveStar Infinity 2 Monitoring System Setup and Operation Manual P 164001106 Rev 01 Maintenance...
Страница 78: ...P 16400110601 P 164001106 01...