© 2023 Eaton. All rights reserved.
.
21
Mounting on a floor-mount pedestal (optional)
1.
Concrete base
2.
48 mm diameter cable opening
3.
M10 stainless steel threaded rods
1.
Prepare a concrete base measuring 700
mm x 400 mm x 150 mm (W x D x H).
2.
Position four M10 stainless steel rods in
the concrete base.
3.
Leave a 48 mm diameter opening in the
concrete base for unobstructed cable
routing.
2
700 mm (27.6 inch)
4
0
0
m
m
(
1
5
.7
inch
)
175 mm (6.9 inch)
350 mm (13.8 inch)
1
4
0
m
m
(5
.5
inch
)
1
2
0
m
m
(4
.7
inch
)
115 mm
(4.5 inch)
2
0
0
m
m
(
7
.9
inch
)
3
3
3
3
1
Содержание Green Motion DC 22
Страница 1: ...2023 Eaton All rights reserved 1 Green Motion DC 22 Installer training...
Страница 45: ...2023 Eaton All rights reserved 45 LED indicator NO light a Not powered...
Страница 48: ...2023 Eaton All rights reserved 48 LED indicator RED light ON a Error in charging...
Страница 49: ...2023 Eaton All rights reserved 49 LED indicator YELLOW light ON a Charger is set to unavailable...
Страница 50: ...2023 Eaton All rights reserved 50 LED indicator ORANGE light BREATHING a An update is in progress...
Страница 59: ...2023 Eaton All rights reserved...
Страница 65: ...2023 Eaton All rights reserved...