![Eaton Green Motion DC 22 Скачать руководство пользователя страница 28](http://html1.mh-extra.com/html/eaton/green-motion-dc-22/green-motion-dc-22_training_3694157028.webp)
© 2023 Eaton. All rights reserved.
.
28
Warnings
• DC leakage protection is provided by means of electrical galvanic
separation and an internal Insulation Monitor Device (IMD).
• Eaton recommends that DC EV chargers installed in a TT system
are equipped with an RCD upstream according to IEC 60364-7-722.
• Eaton recommends that DC EV chargers installed in a TN system
where a fire hazard is present are equipped with an RCD upstream
in accordance with IEC 60364-7-722.
• Eaton’s support team can help with the selection of the proper RCD
to be used.
• In case of connection in TN-C-S networks, earth rods must be used.
• It is not possible to install the unit in an IT grid configuration.
• Always refer to local regulations which may differ from and can
supersede the international regulations listed above.
Содержание Green Motion DC 22
Страница 1: ...2023 Eaton All rights reserved 1 Green Motion DC 22 Installer training...
Страница 45: ...2023 Eaton All rights reserved 45 LED indicator NO light a Not powered...
Страница 48: ...2023 Eaton All rights reserved 48 LED indicator RED light ON a Error in charging...
Страница 49: ...2023 Eaton All rights reserved 49 LED indicator YELLOW light ON a Charger is set to unavailable...
Страница 50: ...2023 Eaton All rights reserved 50 LED indicator ORANGE light BREATHING a An update is in progress...
Страница 59: ...2023 Eaton All rights reserved...
Страница 65: ...2023 Eaton All rights reserved...